Laserfiche WebLink
IHB Architect& <br /> • Architecture *Planning 'Feasibility`Project Managemen• !mad H. Bahbah, Principal <br /> SEPTEMBER 27. 2017 <br /> FOLLOWING DS A"CHHTECT RESPONSE To COMMENT LETTER <br /> [DATED 1®/112/'D 6: <br /> PLEASE NOTE: THE Pr OJECT SCOPE AND DESIGN HAS <br /> CHANGED, SO THE POLLODNG RESPONSES ADDRESS THE <br /> SAME ISSUES RAISEDt;IEC=O�-E, BUT RELEVANT TO THE NEW <br /> PL,kNS NOW ATTACHED. <br /> 1. Update all code references to the current codes as shown above. <br /> Response: Code references are current on the cover sheet and throughout plans. <br /> 2. Provide sections and details for all new stairs, interior and <br /> exterior. Show stringer size, spacing, quantity and stringer <br /> attachment to deck/floor. <br /> Respons€. See A5. for stair sections and details <br /> 3. Provide details for guard attachment at exterior decks and stairs. <br /> Response: See sheet A5.1 for railing details. <br /> 4. Provide Handrails per section R311.7.8 for interior and exterior stairs. Show on <br /> plans. <br /> Response: See 3 &4 on sheet A5.1 for hanaraiis at stairs. <br /> 5. Provide sections and details for deck and guard construction <br /> show all connections and show how decks provide with a <br /> lateral load resisting connection per section R507.2.4 IRC. <br /> Response: See Sections Sheet A4.0. and references to guards on <br /> A5.1. and deck details on A7.1, A7.2. <br /> 6. The existing 14 foot by 20 foot bedroom structure on the north <br /> side of the dwelling appears to have been built without permits <br /> or inspections. Permits are required for the 14 x 20 foot addition. <br /> Include construction drawings for this bedroom as if you were <br /> proposing to build this now. Include foundation plan, sections <br /> and details, floor plan, framing plan, roof framing plan, <br /> ventilation calculations for crawl space and attic. Show energy <br /> code requirements for bedroom addition, including energy <br /> credits based on entire addition. <br /> Response: See Plans. Unpermitted addition included as new r EC E j VE <br /> 11- <br /> construction. 17 <br /> ILIJ <br /> SEP 2 7 2017 <br /> CITY OF EVE <br /> RETT <br /> Permit Services <br />