Laserfiche WebLink
IHB Architects <br /> Architecture *Planning *Feasibility *Project Management !mad H. Bahbah, Principal <br /> Response: See A2.1 for wall legend describing existing vs. new walls. <br /> 17. The foundation plan shows a rebar connected to the existing <br /> foundation where it appears that there is no foundation (north corner <br /> of addition). Please clarify. <br /> Response: See 61.0 lor new iounaation <br /> 18. The plans as submitted do not meet the minimum requirements for <br /> lateral bracing for wind and seismic loading per section R602.10. <br /> Provide lateral analysis prepared by a licensed WA state structural <br /> engineer. All required braced wall panels per IRC R602.10 shall be <br /> clearly marked on the plans. <br /> response: wee structura, Mans and Calculations for bracing and <br /> se;F'- c loading, based on new project scope. <br /> 19. Specify the options chosen for energy credits and specify the <br /> requirements for each option chosen. The plans show two options for <br /> a total credit of 1.5. The current energy Code requires 3.5 credits for <br /> the size of the structure that you are proposing to build. <br /> sponse: See A0.0 for energy Credits. 1 b. c & 5b _ ; 2,redits, <br /> which is rerHred For+his S17P a� 9itinr� <br /> Option la Efficient Building Envelope requires the following <br /> modifications: Vertical Fenestration U = 0.28, Floor R-38, Slab on grade <br /> and below grade slab R-10 Perimeter and under entire slab. <br /> Option 2b Air Leakage control and Efficient Ventilation requires: Reduce <br /> air leakage control to 2.0 air changes per hour maximum AND All whole <br /> house ventilation requirements as determined by section M1507.3 of the <br /> IRC shall be met with a heat recovery ventilation system with a minimum <br /> sensible heat recovery efficiency of 0.70. <br /> -esponse. See A0.0 &AL. or updated i✓nergy Code and Credit <br /> information. <br /> To qualify to claim this credit, the building permit drawings shall specify the option being <br /> selected and shall specify the maximum tested building air leakage and shall specify the heat <br /> -ecovery ventilation system. <br />