My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2212 PINE ST 2019-06-11
>
Address Records
>
PINE ST
>
2212
>
2212 PINE ST 2019-06-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 10:37:17 AM
Creation date
6/11/2019 10:37:06 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2212
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/8/2019 Page <br /> 11:36:46AM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1609-003 Site Address 2212 PINE ST <br /> Applied 9/6/2016 Applicant Lot <br /> Approved 12/7/2017 Owner BANWAIT GURMAIL&KAUR BALBIR Block <br /> Issued 12/14/2017 Contractor GREWALZ CONSTRUCTION INC Tract <br /> Parent Permit No. Description SFR ADDITION AND REMODEL <br /> Notes 2 STORIES+UNF BASEMENT <br /> Outdoor unit not to be installed in any front or side yard setback.Added heat pump&fp insert to scope <br /> of mech work <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 1/4/2018 1/4/2018 BLDG KMK APPROVAL As noted OK to pour <br /> FOOTING/SETBAC Note-Please be sure to clean up dirt and <br /> debris on sidewalk and cover stockpiles <br /> today. <br /> 1/10/2018 1/10/2018 BLDG KMK CORRECTION Plans call for 30"x 30"with 5#4 each way. <br /> FOUNDATION You substitued continuous 14"footing with <br /> 2#4 horizontals. <br /> Verify change at point loads with engineer. <br /> OK to pour pending engineer aproval. <br /> 3/30/2018 3/30/2018 BLDG DWF OTHER No shear required <br /> 07-EXTERIOR <br /> 4/18/2018 4/18/2018 BLDG DWF CORRECTION Plans not available <br /> 07-EXTERIOR <br /> 4/24/2018 4/24/2018 BLDG 13-OTHER DWF OTHER No shear wall <br /> schedule for <br /> SW-1/SW-2 <br /> 4/26/2018 4/26/2018 BLDG DWF CORRECTION Over-nailing shear walls.Re-nail as per <br /> 07-EXTERIOR shear schedule. <br /> Uncover 2nd floor for shear inspection. <br /> 5/1/2018 5/1/2018 BLDG BSM APPROVAL <br /> 07-EXTERIOR <br /> 6/12/2018 6/12/2018 MECH 04-ROUGH SDP PARTIAL APPR As noted 1.Recall for fire place and bath exhaust. <br /> IN 2.Insulation on ducts must meet R-8 will <br /> check crawl at final. <br /> Note:The kitchen footprint will not change. <br /> Just new cabinets etc. <br /> 6/12/2018 6/12/2018 PLUMB SDP APPROVAL As noted Note the kitchen plumbing will not change- <br /> 03-ROUGH IN possibly new fictures <br /> 6/19/2018 6/19/2018 MECH 04-ROUGH SDP APPROVAL As noted 1.Mechanical venting ok <br /> IN 2.Mechanical rough in ok <br /> 3.Ok to continue with framing <br /> 4.Recall for propane,contact fire <br /> department <br /> 6/20/2018 6/20/2018 BLDG DWF CORRECTION Need postive connection post/beam seismic <br /> 08-FRAMING stair stringers. <br /> Note:Verify header above French doors <br /> with engineer supports 7"x 14"beam. <br /> Ok to insulate.Crawl space needs to be <br /> completed-framing. <br /> 7/10/2018 7/10/2018 BLDG DWF CORRECTION Complete-framing correction for 6/20/18 <br /> 11-INSULATION inspection. <br /> Insulation ok. <br /> Note:Provide a copy of insulation <br /> certificate and blower door test results at <br /> building final. <br /> 7/24/2018 7/24/2018 BLDG DWF CORRECTION No access <br /> 08-FRAMING <br /> 7/26/2018 7/26/2018 BLDG DWF APPROVAL OK to cover <br /> 08-FRAMING <br /> 7/26/2018 7/26/2018 BLDG DWF APPROVAL OK to cover <br /> 09-DRYWALL <br /> 7/26/2018 7/26/2018 BLDG DWF APPROVAL OK to cover <br /> 11-INSULATION <br /> INSP12 CRWS YS TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.