Laserfiche WebLink
3/8/2019 Page 2 <br /> City of Everett <br /> 11:36:46AM <br /> INSPECTION ACTIVITY REPORT <br /> 12/17/2018 12/17/2018 GAS 03-FINAL SDP CORRECTION <br /> 12/17/2018 12/17/2018 BLDG 14-FINAL DWF CORRECTION see notes Attention Applicant:mech,plumb and <br /> public works final required before bldg <br /> final inspection <br /> (12/18/2018 7:26 AM DWF) <br /> Need plumbing,mechanical and public <br /> works final before Bldg final inspection. <br /> 12/17/2018 12/17/2018 MECH 06-FINAL SDP CORRECTION (12/17/2018 2:41 PM SDP) <br /> 1)Complete condensate piping for the <br /> furnace. <br /> 2)Have face plate on fireplace off and have <br /> installation manuel on site for the next <br /> inspection. <br /> 12/17/2018 12/17/2018 PLUMB 06-FINAL SDP CORRECTION (12/17/2018 2:45 PM SDP) <br /> 1)Water Heater must be at least 3"above <br /> the surrounding ground and have an <br /> insulating pad between the HWT and the <br /> ground. <br /> 12/26/2018 12/26/2018 BLDG 14-FINAL DWF CORRECTION (12/26/2018 1:56 PM DWF) <br /> Install hand railing as per IRC. <br /> Complete insulation and air seal. <br /> Provide copy of insulation certificate letter <br /> and blower door test results at at Building <br /> Final. <br /> Stairway clearance minimum height 6'-8"as <br /> per IRC <br /> 12/26/2018 12/26/2018 GAS 03-FINAL SDP APPROVAL <br /> 12/26/2018 12/26/2018 MECH 06-FINAL SDP APPROVAL <br /> 12/26/2018 12/26/2018 PLUMB 06-FINAL SDP APPROVAL as noted (12/26/2018 11:40 AM SDP) <br /> plumbing final is ok as noted:1)Owner <br /> will slope the dirt around the waterheater to <br /> prevent debris and water from falling into <br /> or flooding the water heater pit. <br /> 2)add a hanger to the condensate pipe for <br /> the furnace in the crawl space. <br /> 2/19/2019 2/19/2019 BLDG 15-FINAL DWF CORRECTION Phone Message left on John Wisdom's <br /> phone from Sunny at 425-346-8427 <br /> (2/19/2019 11:38 AM DWF) <br /> Stairway clearance height 6-8"min as per <br /> IRC <br /> Need insulation certificate letter and blower <br /> door test results. <br /> Return on stairway hand-railing. <br /> 3/6/2019 3/6/2019 BLDG 15-FINAL DWF APPROVAL (3/6/2019 11:30 AM DWF) <br /> Building final <br /> 3/6/2019 3/6/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CliWsYsrEms <br />