Laserfiche WebLink
.� .. ' ' .._..__...-_ .- __ -- _-._ t� • <br /> T 0 �1 RE UIRED BY 2012 BC � � w <br /> STATE�IE T OF SPEC A SPECT 0 S 2012 BC SPECIA� f� SPEC Q CO CRETE CO STRUCJT 0 ( BC 170503 �c 1705 . 12 . 1 ) . � <br /> 1 . IN ACCORDANCE TO SECTION 1704.2 OF THE 2012 INTERNATIONAL BUILDING CODE INDICATED ITEMS REQUIRING SPECIAL INSPECTION ARE IDENTIFIED UNDER COLUMNS "FREQUENCY OF INSPECTION" AS "PERIODIC" OR ITEM FREQUENCY OF INSPECTION INSTRUCTIONS <br /> (IBC), THE OWNER, OR THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CONTINUOUS". IF NO BOX IS CHECKED, EITHER THE TASK DOES NOT EXIST OR DOES NOT NEED ANY SPECIAL INSPECTION. (� ` <br /> CHARGE ACTING AS THE OWNER'S AGENT, IS REQUIRED TO HIRE AND INDEPENDENT <br /> �. <br /> TESTING/INSPECTION AGENCY TO PERFORM REQUIRED SPECIAL INSPECTIONS. REINFORCING STEEL CONTINUOUS ❑ PERIODIC � VERIF`( PRIOR TO P�ACING CONCRETE THAT Q <br /> S 0 �S C 0 STR U CT 0 C B C 17�5 0 6 ) > REINFORCING IS OF SPECIFIED TYPE, GRADE AND (L <br /> 2. T H I S S T A T E M E N T O F S P E C I A L I N S P E C T I O N S S U B M I T T E D B E L O W I S F U L F I L L M E N T O F SIZE; THAT IT IS FREE OF 01�, DIRT AND RUST; � <br /> THAT IT IS LOCATED AND SPACED PROPERLY; <br /> THE REQUIREMENTS OF 2012 IBC SECTIONS 1704 AND 1705. ITEM FREQUENCY OF INSPECTION INSTRUCTIONS THAT HOOKS, BEND, TIES, STIRRUPS AND � <br /> 3. SPECIAL INSPECTIONS AND TESTING WILL BE PERFORMED IN ACCORDANCE WITH THE ' SUPPLEMENTAL REINFORCEMENT ARE P(.ACED <br /> CORRECTLY; THAT LAP LENGTHS, STAGGER AND � <br /> APPROVED PLANS AND SPECIFICATIONS, THIS STATEMENT, IBC 2012 CHAPTER 17 AND VERIFY SUBGRADE IS ADEQUATE TO CONTINUOUS � PERIODIC ❑ PRIOR TO PLACEMENT OF CONCRETE. OFFSETS ARE PROVIDED; AND THAT ALL � <br /> AISC 360-10 SECTION "N5". ACHIEVE DESIGN BEARING CAPACITY MECHANICAL CONNECTIONS ARE INSTALLED PER <br /> 4. THE INSPECTOR SHALL OBSERVE THE WORK FOR COMPLIANCE WITH THE JURISDICTION THE MANUFACTURER'S INSTRUCTIONS AND/OR <br /> APPROVED PLANS, SPECIFICATIONS, AND APPLICABLE PROVISIONS OF THE IBC, THE VERIFY EXCAVATIONS EXTEND TO CONTINUOUS ❑ PERIODIC � PRIOR TO PLACEMENT OF COMPACTED FILL EVALUATION REPORT. �-- <br /> ARCHITECTS/ENGINEER S REVIEWED SHOP DRAWINGS, AND/OR PLACEMENT DRAWINGS, PROPER DEPTH AND MATERIAL OR CONCRETE. (f� <br /> MAY BE USED ONLY AS AN AID TO INSPECTIONS. <br /> a. CONTINUOUS SPECIAL INSPECTION - THE FULL-TIME OBSERVATION OF WORK CAST-IN BOLTS & EMBEDS CONTINUOUS � PERIODIC ❑ INSPECTION OF ANCHORS OR EMBEDS CAST IN � <br /> VERIFY THAT SUBGRADE HAS BEEN CONTINUOUS � PERIODIC ❑ PRIOR TO PLACEMENT OF COMPACTED FILL. CONCRETE IS REQUIRED WHEN ALLOWABLE � <br /> REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS APPROPRIATELY PREPARED PRIOR TO LOADS HAVE BEEN INCREASED OR WHERE ' <br /> PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. PLACWG COMPACTED FILL STRENGTH DESIGN IS USED. <br /> Q <br /> b. PERIODIC SPECIAL INSPECTION — THE PART—TIME OR INTERMITTENT <br /> OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED PERFORM CLASSIFIGATION AND CONTINUOUS � PERIODIC ❑ ALL MATERIALS SHALL BE CHECKED AT <br /> SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING TESTING OF COMPACTED FILL EACH LIFT FOR PROPER CLASSIFICATIONS POST-INSTALLED ANCHORS OR CONTINUOUS � PERIODIC ❑ ALL POST-INSTALLED ANCHORS/DOWELS SHALL o <br /> PERFORMED AND AT THE COMPLETION OF THE WORK. MATERIALS AND GRADATIONS NOT LESS THAN ONCE DOWELS BE SPECIALLY INSPECTED AS REQUIRED BY THE o <br /> FOR EACH 10,OOOI2T OF SURFACE AREA. APPROVED ICC-ES REPORT. <br /> 5. THE SPECIAL INSPECTOR SHALL COMPLETE A DAILY REPORT FOR EACH DAYS <br /> INSPECTIONS. THE DAILY REPORTS SHALL REMAIN AT THE JOB SITE WITH THE � <br /> CONTRACTOR FOR THE BUILDING DIVISION'S INSPECTOR. THE REPORTS SHALL FY PROPER MATERIALS S PERIODIC USE OF RE UIRED MIX DESIGN CONTINUOUS � PERIODIC ❑ VERIFY THAT ALL MIXES USED COMPLY WITH THE <br /> VERI CONTINUOU Q <br /> > � ❑ �"_' ; <br /> APPROVED CONSTR <br /> UCTION DOC <br /> UMENTS <br /> • ACI — <br /> DE THE FOLLOWING. LIFT THICKNESSES , <br /> INCLU DENSITIES AND <br /> a. NAME OF SPECIAL INSPECTOR AND DATE THE INSPECTION WAS PERFORMED. DURING PLACEMENT AND 318;CH 4, 5.2-5.4; AND IBC 19004.3, 19.13.2, � • <br /> COMPACTION 1913.3. <br /> b. DESCRIPTION OF THE INSPECTIONS, WITH LOCATIONS AND TESTS PERFORMED. <br /> W <br /> 'I c. �ISTING ANY NON—CONFORMING ITEMS. CONCRETE SAMPLING FOR STRENGTH CONTINUOUS � PERIODIC ❑ � <br /> TESTS, SLUMP, AIR CONTENT, AND <br /> '�� d. INCLUDE HOW ITEMS WERE RESOLVED OR UNRESOLVED. TEMPERATURE LL� <br /> e. LIST ANY CHANGES OR CORRECTIONS TO NON-CONFORMING ISSUES AUTHORIZED O ' <br /> HE ENGINE <br /> ER ARCHITECT OR BUILDING DIVISION'S INSPECTORS. CONCRETE PLACEMENT CONTINUOUS ❑ PERIODIC � ' � <br /> BY T , , <br /> - MEDIATE ATTENTION <br /> OF � <br /> � <br /> 6. THE INSPECTOR SHALL BRING N <br /> ON C <br /> ONFORMING IT <br /> EMS TO THE IM <br /> E CONTRACTOR AND NOTE ALL SUCH ITEMS IN THE <br /> DAILY REPORT. IF A <br /> NY ITEM IS NOT � <br /> TH . <br /> � <br /> RESOLVED IN A TIMELY MANNER AND IS ABOUT TO BE INCORPORATED IN THE WORK, THE CURING TEMPERATURE AND CONTINUOUS � PERIODIC ❑ VERIFY THAT THE AMBIENT TEMPERATURE FOR � <br /> OTIFY THE ENGINEER <br /> OF RECORD. <br /> MEDIATELY N EAST 7 <br /> ECTORS SHALL IM T > 50°F FOR AT L <br /> SPECIAL INSP CONCRETE IS KEPT A <br /> � <br /> TEC <br /> HNI UES <br /> Q <br /> 'I <br /> ; DAYS A�fER PLACEMENT. HIGH-EARLY- — <br /> �II'� . THE INSPECTION AGENCY SHALL FURNISH MONTHLY REPORTS OF THE TEST AND <br /> � STRENGTH CONCRETE SHALL BE KEPT AT >50°F <br /> INSPECTIONS PERFORMED DIRECTLY TO THE BUILDING DIVISION, ENGINEER OF RECORD, FOR AT LEAST 3 DAYS. ACCELERATED CURING � <br /> '''� AND OR OTHERS AS DESIGNATED. METHODS MAY BE USED (SEE ACI 318:5.11 .3). <br /> ,' <br /> � THE AMBIENT TEMPERATURE FOR SHOTCRETE <br /> ' 8. THE INSPECTION AGENCY SHALL SUBMIT A FINAL SIGNED AND SEALED REPORT TO THE SHALL BE >40°F FOR THE SAME PERIOD OF TIME <br /> �' BUILDING DIVISION STATING THAT ALL ITEMS REQUIRING SPECIAL INSPECTIONS AND TESTING AS NOTED FOR CONCRETE. SHOTCRETE SHALL BE <br /> WERE FULFILLED, ALL DISCREPANCIES WERE CORRECTED OR RESOLVED, AND ALL WORK KEPT CONTINUOUSLY MOIST FOR AT LEAST 24 <br /> 'I REQUIRING SPECIAL iNSPECTIONS IS IN CONFORMANCE WITH THE APPROVED DESIGN <br /> HOURS AF-fER SHOTCRETING. ALL CONCRETE <br /> DRAWINGS AND SPECIFICATIONS AND APPLICABLE CODES. ANY ITEMS UNRESOLVED OR MATERIALS, REINFORCEMENT, FORMS, FILLERS, . <br /> DISCREPANCIES IN COVERAGE (I.E. MlSSED INSPECTIONS, PERIODIC INSPECTIONS WHEN AND GROUND SHALL BE FREE FROM FROST. IN <br /> CONTINU <br /> OUS WAS RE UIRED ETC SHALL <br /> BE SPECIFICA <br /> LLY ITEMIZED IN THE REPORT. <br /> HOT <br /> WEATHER CONDITIONS ENSURE THAT <br /> Q , <br /> � <br /> 0 IATE MEASURES ARE TAKEN TO AVOID <br /> APPR PR <br /> I�I 9. THE STATEMENT OF SPECIAL INSPECTION HAS BEEN PREPARED BY THE ENGINEER <br /> PLASTIC SHRINKAGE CRACKING AND THAT THE <br /> OF RECORD WITH THE UNDERSTANDING THAT THE BUILDING OFFICIALS WILL: SPECIFIED WATER/CEMENT RATIO IS NOT <br /> EXCEEDED. <br /> a. VE THE UALIFICATIONS OF THE <br /> SPECIAL INSPECTORS WHO <br /> IIII <br /> REVIEW AND APPRQ Q <br /> '�I WILL PERFORM THE INSPECTIONS. <br /> , ERECTION OF PRECAST CONCRETE CONTINUOUS ❑ PERIODIC � VERIFY THAT ALL PRECAST ELEMENTS ARE LIFTED, <br /> b. MONITOR SPECIAL INSPECTION ACTIVITIES ON THE JOB SITE TO ASSURE THAT ASSEMBLED AND BRACED IN ACCORDANCE WITH <br /> THE SPECIAL INSPECTORS ARE QUALIFIED AND PERFORMING THEIR DUTIES AS THE APPROVED CONSTRUCTION DOCUMENTS. <br /> CALLED FOR IN THE STATEMENT OF SPECIAL INSPECTION. � <br /> FORMWORK CONTINUOUS ❑ PERIODIC � VERIFY THAT THE FORMS ARE PLACED PLUMB <br /> c. REVIEW SUBMITTED INSPECTION REPORTS. <br /> AND CONFORM TO THE SHAPES, LINES, AND <br /> DIMENSIONS OF THE MEMBERS AS REQUIRED BY <br /> d. PERFORM INSPECTIONS AS REQUIRED BY THE LOCAL BUILDING CODE. <br /> THE APPROVED CONSTRUCTION DOCUMENTS. <br /> e. WILL ISSUE CERTIFICATION OF OCCUPANCY AFTER ALL SPECIAL INSPECTION , <br /> REPORTS AND THE FINAL SPECIAL INSPECTION REPORT HAVE BEEN SUBMITTED <br /> AND ACCEPTEQ. <br /> i <br /> , <br /> �g�l'�6.tJ���j�j. <br /> g�fi� �� �`,��t��,frF�����'. <br /> '� n.,`�,, <, .y '�''�� �+, <br /> Cav� e al Y,�jder .��� �?. � <br /> � 02: 9 M�(j5-2. � r .0'G fi <br /> +p ' � �} � t !,J �� <br /> � • ; <br /> '� <br /> �`�rv���G�?1E,�.°,�'''� �""" <br /> 9U4 SVI/ 1 bfih Str�efi Suite �C�7 �'������ <br /> . � <br /> Renton, Washin t�n 9�8�57' David P. Balawajder <br /> � WA PE 28184 � <br /> SYM REVISlON BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBO� DATE � <br /> oF WqSH� ACCEPTABILITY KRw 05 30 14 W2534622 05 30 14 � <br /> KRW DPB 05 30 14 �P�� "�Tay THIS DESIGN AND/OR pPg KE° 05 30 14 GENERAL NOTES / / <br /> A ISSUE FOR PERMIT � � SPECIFICATION IS APPROVED SHEEf � <br /> , � BRPH ARCHITECTS ENGI N EER TITLE 40-5 8 � o <br /> ENGINEERSINC. APPROVED BY DEPT. DATE SLJ EWB 05 30 14 <br /> N0.3137 CHECKED 2 `� <br /> APPROVED S ITE 40�YD 0 <br /> N <br /> � = JOB N0. COMP N0. '"� <br /> p=,� P�.° 16950 � , <br /> � /cqTF OF pU1N0��� APPROVED DWG N0. <br /> i STRUCTURAL MASTER EVERETT, WA 40-YD-S2a <br />� � � (PAPER SPACE) SEE: 40-YD00_55-C10.DWG <br />� . ___ _____ - - — -_ _ __— <br />