My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD 2019-06-18
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD 2019-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 8:41:09 AM
Creation date
6/18/2019 8:23:26 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO ISLE PUBLICATIONS <br /> 30 DAY PEAK DEMAND CALCULATION WORKSHEET <br /> PANEL 'L' <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 30-day demand study from : 2/20/2019 to 3/21/2019 <br /> Phase to Phase Voltage (Volts) : 480 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> 30 Day Peak Demand On : 2/26/2019 = 63.52 Amps <br /> Apparent Peak Demand = 52.81 KVA <br /> NEC 220.87(2) adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 66.01 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 66.01 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 66.01 KVA <br /> Other adjustement factor(s) X 1.00 KVA <br /> Measured Peak Demand with Adjustments = 66.01 KVA <br /> New Calculated Demand Load Added Publication + 5.16 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 71.17 KVA <br /> CALCULATED DEMAND CURRENT : 86 AMPS <br /> Note: See WAC 296-46B-900 (3)0)for additional metering requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.