Laserfiche WebLink
Plan Section 4 <br /> Implementation <br /> The preferred long-term alignment for Section 4 is a walkway/bikeway along the shoreline <br /> edge. However, implementation poses several challenges, namely: <br /> • The permitting of over-water construction. <br /> • The expense of structured boardwalks and bridges at the north point and <br /> Delta crossing. <br /> • Property access/easements negotiations at the old Weyerhaeuser site, the <br /> delta crossing, and the Kimberly-Clark tidelands. <br /> A useful first step would be environmental analysis to identify permitting feasibility and mitigation. <br /> New shoreline permits for all projects in this stretch should be conditioned with the requirement for <br /> at least easement rights, and foot/bicycle paths should be a part of any circulation improvements. <br /> Once the permitting and access are resolved, construction funds can be sought. <br /> Since development of the shoreline trail may take several years, improving the trail along Marine <br /> View Drive is recommended. This link will be useful even when the shoreline trail is completed <br /> because it will provide access to the Legion Park and north Everett neighborhoods. <br /> • <br /> Shoreline Public Access Plan Update 2019 3 6 29 <br />