My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/06/12 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/06/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 9:46:11 AM
Creation date
6/18/2019 9:45:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Section 5 <br /> 5.3 West Channel <br /> This trail segment along the shoreline will provide <br /> exceptional views of Ferry-Baker Island and the <br /> river reach. The City and Port should take immediate MUM <br /> first steps toward implementation. r <br /> 5.4 Trail Around Wooded Wetland <br /> Segment 5.4 is a City-owned wooded wetland complex. <br /> Because of this area's ecological sensitivity, the main w <br /> pedestrian/bike trail will skirt the west side of the wetland. <br /> However, a foot-only nature trail (boardwalk) is recom- View east toward <br /> mended to access a viewpoint near the water's edge. Ferry-Baker Island. <br /> 5.5 "Pinch Point" <br /> The area south of the City-owned wooded wetland complex is particularly challenging <br /> because there is very little property available between the railroad and the shoreline. Also, <br /> the connection uphill to E. Marine View Drive and the future bridge to Langus Park will be <br /> expensive to construct. <br /> A pre-existing row of piles right next to the <br /> shoreline could host a new elevated trail <br /> (although new piles would be needed to <br /> support the new structure). In any case, a <br /> new trail would have to be landward of the I 51.4' Inor <br /> 1-5 bridge columns, since this section of _ ' <br /> the river is already pretty rett narrow. - <br /> , <br /> `� - — Area between the two railroad tracks where the <br /> ! pedestrian/bike overpass should link the <br /> 3 shoreline trail to E. Marine View Dr. <br /> \sal <br /> Sketch of potential overpass to <br /> x i E Marine View Dr. and elevated trail <br /> underneath 1-5 Bridge. View from south <br /> The future pedestrian/bike bridge to Langus Riverfront Park will connect the future trail on <br /> E. Marine View Drive with the bike trail on Smith Island. Reaching E. Marine View Drive <br /> from the shoreline, though, means crossing at least two railroad tracks and ascending the <br /> steep slope between the two levels. <br /> Of the many possible solutions, the most feasible seems to be a pedestrian/bike overpass <br /> that crosses the railroad tracks and reaches a City-owned lift station site that connects to E. <br /> Marine View Drive. This solution would also connect the shoreline trail right next to the <br /> Langus Riverfront Park bridge and create possibilities of loops with the E. Marine View <br /> Drive trail and connection with the near neighborhood. <br /> Shoreline Public Access Plan Update 2019 40 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.