My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/06/12 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/06/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 9:46:11 AM
Creation date
6/18/2019 9:45:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Section 6 <br /> Description of Improvements and Details <br /> S1- Riverpoint - ,. - . - - . - e e - <br /> There are two options for this segment, depending on how the property is developed: <br /> a. A trail along the shoreline, if the property is developed for a nonwaterdependent use. <br /> b. A trail along an internal roadway, if the land is developed for a waterdependent use. <br /> (The alignment may vary.) <br /> If a trail is developed along the shoreline(6.1a), it should be integrated into the <br /> environmental enhancement and adjacent open space that benefit the development and <br /> the general public. If the trail is constructed along an internal roadway, it should be <br /> separated from traffic and landscaped. <br /> 6.2 Possible 23rd St Connection <br /> When the Kimberly-Clark land is redeveloped, an.overpass on 23rd Street may be <br /> necessary for vehicular access. If so,the improvements should include a <br /> pedestrian/bicycle trail connection back to the north Everett neighborhoods and E. Marine <br /> View Drive. <br /> 6.3 Everett Avenue Connection <br /> The City is contemplating a future overpass/extension of Everett Avenue. If this occurs, a <br /> pedestrian/bicycle trail connection should be included as part of the design. <br /> 6.4 Everett Avenue Street-End Viewpoint <br /> The City retains ownership of the Everett Avenue street-end. The property is currently <br /> leased to an adjacent property owner on a year-to-year basis.A small overlook and picnic <br /> area—and perhaps a small boat rest stop—should be constructed when the trail is <br /> developed in this vicinity. <br /> 6.5 Connections from Riverpoint to Highway 2 Bridge <br /> There are two parallel trail connections in this segment: <br /> a. The construction of a new shoreline trail east of the railroad tracks. This link will provide <br /> the safest, most direct, and most attractive experience, but it cannot be developed until <br /> the City obtains an easement or purchases the necessary right-of-way. <br /> yam, <br /> Tom _ <br /> R " = .tpf mss{,,,: <br /> Looking south from the SR-2 bridge <br /> Shoreline Public Access Plan Update 2019 40 <br /> 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.