Laserfiche WebLink
Project Cost Estimateee1� H W A Rd: 2011-058 <br /> EverettStreetscepe f1HVAGEOSCIENCESINC Data 4-Apr-19 <br /> Construction Support <br /> Pre red for Perfect Prop/redly: SRN <br /> Inti t ti tt t tttttttttttltttttltlttttttltllltttltt t Hlltlt RIltltttttltlttMitllllltlllilttilliltlllttllltllllllllllliffiailil Iil?iillltllllillilifi,ll lliiii?; jcopt of Work <br /> il <br /> Provide construction suppiirt matin•to soiltopaviunent issues,as requested by Client,up to 12 hours total. <br /> ,fiat tt:€lI € hitt I $ t Itillitilltittti itititt itl l ittatlillIB1t1�111f4111111fllllltlill tRitifl llilllllli tillallaiit tI; ffilliI11,1;ll, '.s,i:,,,,. :.:: Ii! <br /> ESTIMATED NWA LABOR: <br /> PERSONNEL a 2019 BILLING RATES - <br /> WORK 1ASK Principal Engr.VI Engr.1 Geol,II Geol.11 CAD Clerical TOTAL TOTAL <br /> DESCRIPTION $230.00 $210.00 1115.00 $90.00 $100.00 $125.00 $80.00 HOURS AMOUNT <br /> Construction Support 12 12 $2,520 <br /> TOTAL LABOR CHARGES: 0 17 0 0 0 D 0 12 S2,620 <br /> LABORATORY TEST SUMMARY: ESTIMATED DIRECT EXPENSES: <br /> Ext.No. Unit Total Mileage as IRS Rale $30 <br /> lest tests CoA Cost Laboratory Testing $0 <br /> Grain Site Distribution 0 190 50 TOTAL DIRECT EXPENSES: 1 $30I <br /> Atterbtrg limits 0 5140 SO <br /> CBR/Proctor 0 5450 SO <br /> LABORATORY TOTAL: SO PROJECT TOTALSAND SUMMARY: <br /> Total Labor Charges $2,520 <br /> Direct Expenses $30 <br /> GRANO TOTAL: inima,g3.1 <br />