My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 6/4/2019 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2020
>
Perteet Inc 6/4/2019 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:04:35 AM
Creation date
6/18/2019 11:04:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
6/4/2019
Council Approval Date
5/29/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvements 2 & 3
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$492,340.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JGM Landscape Architects <br /> Scope of Services <br /> City of Everett <br /> Everett Downtown Streetscape <br /> Rucker Avenue and Hoyt Avenue <br /> Scope of Services <br /> This task order agreement includes professional services to provide limited construction <br /> support consulting services for construction phase of work. <br /> Work Element 2 — CONSTRUCTION ADMINISTRATION AND ENGINEERING <br /> SUPPORT(JGM Landscape Architects) <br /> 2.3 Weekly Construction Meetings <br /> JGM will attend two site visits during construction and the Punchlist review for <br /> a total of three visits. <br /> 2.4 Review of Shop Drawings and Materials Submittals <br /> JGM will provide limited assistance to the City during the construction period <br /> to review material submittals for irrigation, planting, soil mixes, RFI's, shop <br /> drawings and related landscape construction work items. <br /> 2.6 Landscaping and Irrigation Inspection <br /> JGM will review construction progress, plant materials, and irrigation <br /> installation as requested by the City Inspector. JGM will prepare written copy of <br /> meeting minutes related to planting and irrigation improvements. JGM will <br /> attend punch-list review in the field of planting and irrigation work. Prepare a <br /> written punch-list of planting and irrigation corrections or completion items. <br /> Attend a final field review of completed planting and irrigation work. <br /> Deliverables: <br /> • Provide submittal review information to Perteet. <br /> • Provide written copy of meeting minutes. <br /> • Provide written punch-list of planting and irrigation corrections or completion <br /> items. <br />
The URL can be used to link to this page
Your browser does not support the video tag.