My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 6/4/2019 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2020
>
Perteet Inc 6/4/2019 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:04:35 AM
Creation date
6/18/2019 11:04:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
6/4/2019
Council Approval Date
5/29/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvements 2 & 3
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$492,340.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposed by the Contractor. Consultants may provide reviews for the following elements and the effort <br /> for reviews will be limited to that shown in the Consultant's fee proposal: <br /> a. Perteet—Roadway and related items,stormwater, illumination,signals and raised planters; <br /> b. JGM—Irrigation and landscaping; <br /> c. Makers — Urban design elements, including but not limited to site furnishings and raised <br /> planters. <br /> 2.5 Requests for Information/Clarifications <br /> Provide clarification of the contract documents to the City based upon the Contractor's written requests <br /> for clarifications,verbal requests or as requested by the City. Prepare and submit written responses and <br /> drawings or sketches to the City to clarify the contract documents.The effort for this work element is <br /> limited to that as shown in the Fee Determination. <br /> Landscaping and Irrigation Inspection <br /> JGM will review construction progress, plant materials,and irrigation installation as requested by the City <br /> Inspector. JGM will prepare a written copy of meeting minutes related to planting and irrigation <br /> improvements.JGM will attend punch-list review in the field of planting and irrigation work. Prepare a <br /> written punch-list of planting and irrigation corrections or completion items.Attend a final field review of <br /> completed planting and irrigation work. <br /> Assumptions: <br /> • It is assumed City Staff will prepare all agendas,and meeting minutes. <br /> • The level of effort for each work element is limited to the amount of labor and expenses <br /> indicated in the attached Fee Determination.Additional effort beyond these limits will be <br /> considered Extra Work. Labor allowances are an estimate only.The level of effort required for <br /> this work cannot be accurately predicted as it depends on issues outside of the Consultant <br /> team's control. Some of these issues include quality of Contractor submittals,number of <br /> submittals and if multiple reviews are required and unforeseen conditions at the site.Allowance <br /> for multiple submittals due to unacceptable quality of the submittals is not included in the labor <br /> hours estimate. <br /> • The landscaping and irrigation inspection includes two(2)site visits.Additional site visits will be <br /> considered extra work. <br /> Deliverables: <br /> • One (1) Full size set of Plans for Construction,hard copy and electronic copy on CD <br /> • One (1)Original set of Contract Specifications for Construction <br /> • RFI Responses <br />
The URL can be used to link to this page
Your browser does not support the video tag.