Laserfiche WebLink
Utility Conflict Information (mainly water) <br /> The rerouting of the water main at Station 3019 should be done on the street side of the <br /> project and not along the back side of the station as proposed. <br /> There are no observable modifications to any of the station footings due to the proximity to <br /> water mains. There should be a minimum of 2ft of clearance from the edge of the pipeline to <br /> the closest edge of the footing. In some cases this will require modification of the footing <br /> dimensions. <br /> Any work done on the live water mains will be performed by the City water department and the <br /> developer's expense.This should be noted on the plans. <br /> Pot-holing will likely be required to determine the exact location of the water mains before <br /> beginning the construction.This should be noted on the plans. <br /> A strategy for protection of all water mains within any of the station footprints must be <br /> developed that will also include some plan for future rerouting and/or encasement of the water <br /> main to facilitate ease of removal and repair. This will likely require additional discussions with <br /> the City Utility Department. <br /> l3 /-3 <br />