Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> CT SWIFT II 90% Lane Closure - Traffic Control Special Provisions <br /> Job Charge: Reviewed By: Office&Mail Stop: Phone: Date: S -,- <br /> Corey N. Hertcori City of Everett Traffic Engineering 425-257-8887 12/12/2016 1 of 3 <br /> # Sht1Pg Reviewer's Comment Designer's Response Init. <br /> 1 SP3 We should encourage night work whenever possible along Airport Rd in the <br /> City of Everett. A City of Everett noise variance will be required, but at <br /> most locations work can occur at night. Recommend the following hours <br /> for traffic control lane and shoulder closures within the City of Everett: <br /> • Shoulder closures will be allowed without time restrictions provided <br /> there is no lane encroachment. Shoulder closures with lane <br /> encroachment shall will follow the same restrictions as single lane <br /> closures. <br /> • Single lane closures will be allowed NB on Airport Rd between SR <br /> 526 and Evergreen Way from 7:30am and 4:30am. <br /> • Single lane closures will be allowed SB on Airport Rd between SR <br /> 526 and Evergreen Way from 5:00pm and 2:00pm, with the <br /> exception of Airport Rd south of Evergreen Way. <br /> Airport Rd south of Evergreen Way is Snohomish County and WSDOT <br /> jurisdiction, and the roadway section changes, so I would recommend you <br /> coordinate detailed hours for lane closures. <br /> 2 SP3-SP4 It is unlikely that the work can be done excavating and placing the concrete <br /> panels at the Swift II stops with just a single lane closure on Airport Rd. <br /> Multi-lane closure may be desirable, provided they are restricted to only <br /> certain activities, or are given a finite number of working days to allow the <br /> contractor to work as efficiently as possible. I recommend allowing the <br /> following hours for traffic control two lane closures within the City of <br /> Everett: <br /> • Two lane closures will be allowed NB on Airport Rd between SR <br /> 526 and Evergreen Way from 8:00am and 4:00am. <br /> • Two lane closures will be allowed SB on Airport Rd between SR <br /> 526 and Evergreen Way from 6:30pm and 2:00pm. <br /> Concrete curing will either require a high early mix or round the clock <br /> closures. I would recommend that specification stipulate the concrete <br /> panels be placed on Friday night or Saturday to allow for curing and <br /> placement of asphalt patch (following curing). Weekend work for round the <br /> clock lane closures is recommended on Airport Rd. This may already have <br /> been done other sections of the special provisions. I do not have a full copy <br /> CT SWIFT II 90pct Lane Closure-Traffic Control Special Provisionsx <br />