Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> CT SWIFT II 90% Lane Closure - Traffic Control Special Provisions <br /> Job Charge: Reviewed By: Office&Mail Stop: Phone: Date: She <br /> Corey N. Hertcori City of Everett Traffic Engineering 425-257-8887 12/12/2016 ( 0 3 <br /> # Sht/Pg Reviewer's Comment Designer's Response ` Init. <br /> at the time of comment. <br /> 3 SP3 Signals that are made dark or put into flashing operation require a <br /> uniformed police officer within the City of Everett. I recommend following <br /> bullet be added for Airport Rd within the City of Everett: <br /> • Traffic signals shall not be placed into flashing mode without <br /> control by a Uniformed Police Officer. Traffic signals will not be <br /> allowed to be placed in flashing operation or made dark from <br /> 4:30am to 7:00pm. <br /> Traffic signals on Airport Rd within the City of Everett are operated under <br /> agreement by Snohomish County, so any signal not returning to normal <br /> operation should be reported to Snohomish County dispatch. I do not <br /> anticipate needing to put a traffic signal in flash for construction, but the <br /> specification may be necessary under certain traffic control schemes. <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> CT SWIFT II 90pct Lane Closure-Traffic Control Special Provisionsx <br />