Laserfiche WebLink
• PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> Community Transit Swift 11 BRT— Corridor Stations (90% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: She <br /> Varies by Discipline June 22, 2017 1 of 8 <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning February 3, 2017 <br /> # Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> Public Works Review <br /> 1 C0.02 Please change the City of Everett Utility Contact Euneka Revised. Otak <br /> from Euneka Richards to Kirk Brooks with phone Richards <br /> number(425)257-8814 <br /> 2 TS-9.1 Please change the 2nd to last paragraph in C Note Euneka We propose to relocate/re-install the existing post. There Casseday <br /> 1 to the following: "Remove existing Type PPB Richards is nothing to salvage to the City's signal shop. (See note <br /> post and curb base foundation and salvage Type 2, TS-9.1). <br /> PPB post to City of Everett Signal Shop." <br /> 3 TS-10.1 Please change C Note 1 to read: "Remove and Euneka Will do. (No salvage.) Casseday <br /> dispose of existing conventional...'' Richards <br /> 4 TS-10.1 Please change C Note 2 to read: "Remove and Euneka Will do. (No salvage.) Casseday <br /> dispose of existing conventional (Dummy) Richards <br /> Type..." <br /> 5 General, Everett Standards for when to install APS Euneka Will do. Casseday <br /> TS-10.2 stipulate that if you are going to relocate a ped Richards <br /> push button you must upgrade that button to APS. Previously CT was told no APS pushbutton upgrades <br /> You cannot relocate a non-APS push button to a were required at Airport/112th. Only the signal heads <br /> PPB pole. We have recently also married our were to be revised to countdown heads. <br /> curb ramp upgrades to our APS upgrades to However, in an effort to minimize disruption to the <br /> prevent having pay twice for sidewalk removal proposed new curb ramp area in the future, the 90% <br /> and installation work. Both of these standards design incorporated an appropriately located PPB post. <br /> require your project to upgrade the ped push The City's NEW standard of marrying PPB to ramp <br /> button for ped signal 89 to an APS button. We do upgrades is consistent with the proposed new PPB post <br /> not want to force projects that are only disturbing location. We make the APS upgrades noted in the <br /> one corner to have to install PPB poles and APS comment. <br /> on all corners, so our standards call for APS <br /> upgrades to occur on a crossing by crossing basis - <br /> using the Polara Navigator 4 wire system and <br /> PPB poles are only required where you are doing <br /> curb ramp or side walk work. Following this <br /> Swift II BRT Everett Public Works Comment Sheet_90 Stations_OtakResponse.doc <br />