My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> Community Transit Swift II BRT— Corridor Stations (90% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: She <br /> Varies by Discipline June 22, 2017 (40q) <br /> 8 <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning February 3, 2017 <br /> # Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> 10 SP3-SP4 It is unlikely that the work can be done excavating Corey Lane closure hours noted in the Special Provisions for Otak <br /> and placing the concrete panels at the Swift II Hert concrete pavement construction include: <br /> stops with just a single lane closure on Airport Rd. For the Cement Concrete Roadway construction: <br /> Multi-lane closure may be desirable, provided they <br /> are restricted to only certain activities, or are given Multiple lane closures will be permitted with prior <br /> a finite number of working days to allow the approval from the applicable jurisdiction(s) between the <br /> contractor to work as efficiently as possible. I hours of 9:00 pm Friday to 5:00 am Monday. During <br /> recommend allowing the following hours for traffic these times the Contractor shall work continuously and <br /> control two lane closures within the City of reopen adjacent lanes to traffic immediately following <br /> Everett: completion of work. Cement concrete roadway shall be <br /> • Two lane closures will be allowed NB on re-opened to traffic as soon as a compressive strength of <br /> Airport Rd between SR 526 and 2500 psi is reached. <br /> Evergreen Way from 8:00am and 4:00am. Portable Changeable Message Sign <br /> • Two lane closures will be allowed SB on The Contractor shall furnish and install Portable <br /> Airport Rd between SR 526 and Changeable Message Signs to notify of closures, lane <br /> Evergreen Way from 6:30pm and 2:00pm. closures or detours a minimum of one week in advance <br /> Concrete curing will either require a high early mix of closure/detour. <br /> or round the clock closures. I would recommend Refer to Special Provisions beginning on page SP51. <br /> that specification stipulate the concrete panels be <br /> placed on Friday night or Saturday to allow for <br /> curing and placement of asphalt patch (following <br /> curing). Weekend work for round the clock lane <br /> closures is recommended on Airport Rd. This <br /> may already have been done other sections of the <br /> special provisions. I do not have a full copy at the <br /> time of comment. <br /> Swift ii BRT Everett Public Works Comment Sheet_90 Stations_OtakResponse.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.