Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> Community Transit Swift II BRT- Corridor Stations (90% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: Sh <br /> Varies by Discipline June 22, 2017 ( 80f8/ <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning February 3, 2017 <br /> # Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> 21 C4.29, Please do not show any drainage structures/pipes Jane Drainage pipes and structures shown to be removed on Otak <br /> C4.30, that have been removed on this sheet(Typ.) OR Zimmer Demo Plans have been removed from C3, C4 and C5 <br /> C4.31, clearly label those that are no longer there vs. man series plan sheets. <br /> and C4.33 those that are (Typ.) <br /> 22 C4.31 Pipe was removed Jane See response to Comment#21 above. Otak <br /> Zimmer <br /> man <br /> 23 C4.33 Show removed in C2.33 Jane See response to Comment#21 above. Otak <br /> Zimmer • <br /> man <br /> 24 C4.33 Please do not show any drainage structures/pipes Jane See response to Comment#21 above. Otak <br /> that have been removed. Zimmer Proposed detention system replaces existing system in- <br /> This sheet in particular is very confusing. What man kind. Detention system is being relocated outside of the <br /> was the purpose/function of the previous system? proposed Station footprint. <br /> Does the new one provide the same? <br /> Everett Transit Review <br /> 25 Sabina Papa (Everett Transit) provided an email No further action required. Otak <br /> dated January 5th which indicated that her <br /> • comments have been addressed. <br /> Swift II BRT Everett Public Works Comment Sheet_90 Stations_OtakResponse.doc <br />