My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> Community Transit Swift II BRT- Corridor Stations (90% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: Sh <br /> Varies by Discipline June 22, 2017 7 of <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning February 3, 2017 <br /> # Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> 16 There are no observable modifications to any of Halley Station 3019 (100th Street SW Northbound)—A special Otak <br /> the station footings due to the proximity to water Kimball retaining wall and shelter foundation configuration for this <br /> mains. There should be a minimum of 2ft of location is shown on sheet F1.06 of the Plans. See <br /> clearance from the edge of the pipeline to the response to comment above. <br /> closest edge of the footing. In some cases this will Station 3020 (112th Street SW Northbound)—Shelter <br /> require modification of the footing dimensions. foundations have been revised to column footings. See <br /> plan sheets F1.04 and F1.07. <br /> 17 Any work done on the live water mains will be Halley Currently the only work proposed on City of Everett water Otak <br /> performed by the City water department and the Kimball mains is valve adjustments. For any work not specifically <br /> developer's expense. This should be noted on the noted in the Plans, the Contractor and Community <br /> plans. Transit's Construction Management team will coordinate <br /> with the City. <br /> 18 Pot-holing will likely be required to determine the Halley Design potholing information is shown on the Plans and Otak <br /> exact location of the water mains before beginning Kimball denoted as"PH-#'. Contractor is also required in the <br /> the construction. This should be noted on the Special Provisions to pothole in advance of underground <br /> plans. work. <br /> 19 A strategy for protection of all water mains within Halley Noted. Please review the updated plans including Otak <br /> any of the station footprints must be developed Kimball revised footing configurations. The design team is also <br /> that will also include some plan for future rerouting available to meet and discuss any remaining concerns. <br /> and/or encasement of the water main to facilitate <br /> ease of removal and repair. This will likely require <br /> additional discussions with the City Utility <br /> Department. <br /> Drainage Review <br /> 20 Jane Zimmerman (Our Drainage Engineer) has Jane Noted. Otak <br /> marked up a set of plans which mainly had to do Zimmer <br /> with showing unnecessary drainage structures on man <br /> the plans. I have attached a PDF to show this plan <br /> review. <br /> Swift ii BRT Everett Public Works Comment Sheet_90 Stations_OtakResponse.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.