My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> 3 ' <br /> Project Title: <br /> Community Transit Swift II BRT— Corridor Stations (100% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: Sheet <br /> Varies by Discipline August 22, 2017 3 of 3 <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning August 8, 2017 <br /> Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> 7 Plan Sheet 6. Sheet C4.35—The control structure for CB 682 Erik The control structure for CB682 has been revised to Otak <br /> C4.35 must comply with City of Everett Standard Emerson comply with City of Everett Standard Drawings 415 and <br /> Drawings 415 and 416. Most notably: 416. <br /> •The 8"sheer gate should be a lift gate per Detail The sheer gate has been replaced with a lift gate. <br /> "C" of Standard Drawing 416. <br /> • Provide 24" minimum clearance from the steps 24-inch minimum clearance from the steps to all <br /> to all appurtenances. appurtenances has been provided when feasible. On <br /> CB682, clearance between the lift gate and steps has <br /> been maximized (19-inches of separation provided); <br /> however, the structure cannot be upsized tameet the 2-ft <br /> clearance requirement due to site and right-of-way <br /> constraints. <br /> •6" separation must be provided between the top A 6-inch separation between the top of the riser and the <br /> of riser and the bottom of the CB lid. Based on the bottom of the catch basin lid has been confirmed with <br /> rim elevation it looks like it will be close: revised elevations per City of Everett Standards. See <br /> Plan Sheet C4.35 for revisions. <br /> Note: The water quality device (oil pollution control riser) <br /> in CB687 on sheet C4.35 has been revised to match City <br /> of Everett Standard Drawing 414 for construction (see <br /> detail on Plan Sheet C4.35), but the pay item name will <br /> remain as shown in the Plans, Specs, and Estimate for <br /> this project. <br /> Swift II BRT Everett Public Works Comment Sheet_100 Stations_OtakResponse.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.