Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> Community Transit Swift II BRT— Corridor Stations (100% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: Sheet <br /> Varies by Discipline August 22, 2017 200 <br /> 3 <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning August 8, 2017 <br /> # Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> 5 Plan Sheet 4. Sheet 04.31 —A 6" canopy drain is graphically Erik Noted. The invert of the 6" PVC pipe has been raised to Otak <br /> C4.31 shown connecting to the same side of a Type 1 Emerson allow for a distance of 8-inches between knockouts for <br /> CB as an existing 12 pipe, which is un- the 6" PVC pipe and the 12" existing pipe. <br /> constructible. The canopy drain line should <br /> connect from the curb side of the CB, with <br /> appropriate fittings in the line. <br /> 6 Plan Sheet 5. Sheet C4.33—The proposed replacement Erik The proposed replacement detention system has been Otak <br /> C4.33 detention system must comply with City of Everett Emerson revised to comply with City of Everett Standard <br /> Standard Drawing 418, which differs slightly from Drawing 418. <br /> the EDDS equivalent. Most notably: <br /> • Connecting pipes between the end structures An informal deviation request to keep the connection <br /> and the tank must be a minimum of 48" dia. Since pipes at 36" diameter was granted via email response <br /> the tank is 48" in diameter no reduced diameter from Erik Emerson on 8/18/17 (under the condition that <br /> connections will be allowed. the 36" diameter portion not exceed 2' in length, and that <br /> the IE of the 36" diameter should equal the IE of the <br /> larger 48"diameter tank pipe). Both conditions are met <br /> with the revised sheets. <br /> • Steel pipe is not permitted within the City. I'm not The pipe material has been clarified in the construction <br /> familiar with the acronym SRSSP. Ensure that the note as"Steel Reinforced Polyethylene Storm Sewer <br /> pipe material is allowed per the City Design and Pipe (SRPSSP)"and was deemed acceptable via email <br /> Construction Standards and Specifications. response from Erik Emerson on 8/18/17. <br /> Swift II BRT Everett Public Works Comment Sheet_100 Stations_OtakResponse.doc <br />