My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> Community Transit Swift II BRT— Corridor Stations (100% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: Sheet <br /> Varies by Discipline August 22, 2017 200 <br /> 3 <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning August 8, 2017 <br /> # Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> 5 Plan Sheet 4. Sheet 04.31 —A 6" canopy drain is graphically Erik Noted. The invert of the 6" PVC pipe has been raised to Otak <br /> C4.31 shown connecting to the same side of a Type 1 Emerson allow for a distance of 8-inches between knockouts for <br /> CB as an existing 12 pipe, which is un- the 6" PVC pipe and the 12" existing pipe. <br /> constructible. The canopy drain line should <br /> connect from the curb side of the CB, with <br /> appropriate fittings in the line. <br /> 6 Plan Sheet 5. Sheet C4.33—The proposed replacement Erik The proposed replacement detention system has been Otak <br /> C4.33 detention system must comply with City of Everett Emerson revised to comply with City of Everett Standard <br /> Standard Drawing 418, which differs slightly from Drawing 418. <br /> the EDDS equivalent. Most notably: <br /> • Connecting pipes between the end structures An informal deviation request to keep the connection <br /> and the tank must be a minimum of 48" dia. Since pipes at 36" diameter was granted via email response <br /> the tank is 48" in diameter no reduced diameter from Erik Emerson on 8/18/17 (under the condition that <br /> connections will be allowed. the 36" diameter portion not exceed 2' in length, and that <br /> the IE of the 36" diameter should equal the IE of the <br /> larger 48"diameter tank pipe). Both conditions are met <br /> with the revised sheets. <br /> • Steel pipe is not permitted within the City. I'm not The pipe material has been clarified in the construction <br /> familiar with the acronym SRSSP. Ensure that the note as"Steel Reinforced Polyethylene Storm Sewer <br /> pipe material is allowed per the City Design and Pipe (SRPSSP)"and was deemed acceptable via email <br /> Construction Standards and Specifications. response from Erik Emerson on 8/18/17. <br /> Swift II BRT Everett Public Works Comment Sheet_100 Stations_OtakResponse.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.