Laserfiche WebLink
Kirk Brooks <br /> From: Kirk Brooks <br /> Sent: Tuesday, September 05, 2017 8:36 AM <br /> To: 'Windi Shapley' <br /> Cc: Erik Emerson; Brian Doolan <br /> Subject: CT Swift Stations <br /> Windi, <br /> Just about ready to sign off plans but we noticed an issue that needs correcting; <br /> • Sheets C4.33 and C4.35 are making reference to pipe lengths of 5' where it should be 2'. Our maintenance <br /> department agreed to a reduction of pipe diameter from 48"to 36" if the run between the detention pipe and <br /> the manhole were to keep a length of 2'.There appear to be 6 places on these sheets that still refer to the 5' <br /> length. Please have this corrected and submit these two sheets to me via email. <br /> Thanks <br /> Kirk Brooks <br /> City of Everett Public Works Department I Development Technician <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 <br /> Direct: 425-257-8814 <br /> Email: kbrooks(ceverettwa.gov <br /> All emails, and attachments, sent to and from City of Everett are public <br /> records and may be subject to public disclosure pursuant to RCW 42.56. <br /> 1 <br />