Laserfiche WebLink
a A I " <br /> Submittal <br /> Granite Construction Company <br /> 1525 East Marine View Drive, Everett,Washington 98201 <br /> PROJECT: Community Transit DATE: 10/4/17 <br /> Swift Green Line—Corridor Stations RETURN BY: 10/18/17 <br /> Contract No. <br /> Granite Project No. 730211 <br /> TO: Todd Jacobs <br /> Project Manager <br /> Community Transit <br /> 7100 Hardeson Road <br /> Everett, WA 98203 <br /> FROM: Aaron Wilson, Project Manager <br /> Submittal Bid Spec. Page Submittal Description Number of Action <br /> No. Item(s) Reference(s) Number Copies Taken <br /> 017 Sch E 1-10.2(2) SP66-68 Everett TC Plans Electronic <br /> REMARKS BY CONTRACTOR: <br /> All proposed TC plans for work on Sch E (Everett) stations attached. <br /> BY: Aaron Wilson DATE: 10/4/2017 <br /> SPACE BELOW FOR ENGINEER Remarks: <br /> The above shop drawings, product data, <br /> and/or samples are returned with action <br /> as designated above in accordance with <br /> the following legend. <br /> A-Approved <br /> B-Approved as Corrected C - Revise and resubmit <br /> C- Revise and Resubmit <br /> D-Not Approved <br /> E- No Exceptions Taken BY: Eric Shimizu, PE, PTOE <br /> F-No Comment/Information Purposes Only DATE: 10/13/1 <br /> Contractor shall include all applicable lane closure hours (per contract) on <br /> the specific TC plan sheet and also reference: <br /> * that all TCP sheets refer to additional requirements in the Special <br /> Provisions, in particular Special Provision 1-07.23. <br /> * Contractor shall notify the Washington state patrol; local fire, police, <br /> emergency service, and the applicable jurisdiction(s); in writing a minimum <br /> of 5 days prior to each closure. Contractor shall furnish copies of these <br /> notifications to the Engineer. <br /> * No lane closures will be allowed on a holiday or holiday weekend. <br /> Holidays that occur on Friday, Saturday, or Monday are considered a <br /> holiday weekend. <br />