Laserfiche WebLink
Regulatory Distance From <br /> Posted Speed Traveled Way <br /> (Feet) <br /> 35 mph or less 10 * <br /> 40 mph 15 <br /> 45 to 55 mph 20 <br /> 60 mph or greater 30 <br /> * or 2-feet beyond the outside edge of sidewalk <br /> Minimum Work Zone Clear Zone Distance <br /> (January 5, 2015 WSDOT GSP, Option 5) <br /> Lane closures are subject to the following restrictions: <br /> • Local/business access shall be maintained at all times unless otherwise <br /> permitted by the Engineer and advanced notification to property owners is <br /> provided. <br /> • SR 527/Bothell Everett Highway and SR 961132nd Street SE/128th Street SE — <br /> State Routes and State Route Intersections <br /> o Shoulder closures will be allowed between 9:00 am and 2:00 pm Monday <br /> through Friday, and 8:00 pm and 5:00 am Sunday through Thursday <br /> (nightly). <br /> o Single lane closures will be allowed between 8:00 pm and 5:00 am <br /> Sunday through Thursday (nightly). <br /> o Multiple lane closures for paving will be allowed between 9:00 pm and <br /> 5:00 am Monday through Thursday (nightly). <br /> • 128th Street SW/Airport Road — 1-5 to SR 99 <br /> Unincorporated Snohomish County <br /> o Shoulder closures will be allowed between 9:00 am and 2:00 pm Monday <br /> through Friday, and 8:00 pm and 5:00 am Sunday through Thursday <br /> (nightly). <br /> o Single lane closures will be allowed between 8:00 pm and 5:00 am <br /> Sunday through Thursday (nightly). <br /> o Multiple lane closures for paving will be allowed between 9:00 pm and <br /> 5:00 am Monday through Thursday (nightly). <br /> • Airport Road — SR 99 to SR 526 <br /> City of Everett/ Unincorporated Snohomish County <br /> o Shoulder closures will be allowed between 9:00 am and 2:00 pm Monday <br /> through Friday, and 8:00 pm and 5:00 am Sunday through Thursday <br /> (nightly). <br /> o Single lane closures will be allowed between 9:00 am and 2:00 pm <br /> Monday through Friday, and 8:00 pm and 5:00 am Sunday through <br /> Thursday (nightly). <br /> o Multiple lane closures for paving will be allowed between 9:00 pm and <br /> 5:00 am Monday through Thursday (nightly). <br /> • Contractor shall return lanes to normal operations at the end of each working day <br /> or provide temporary pavement markings and temporary traffic control devices. <br /> //3 <br /> Swift Green Line—Corridor Stations Special Provisions SP51 <br /> May 2017 <br />