My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> hours of 7:00 am to 7:00 pm Saturdays and Sundays only. These fifteen-minute <br /> blockages shall be separated by an interval long enough to allow the delayed vehicles to <br /> clear. <br /> Signal Turn-On <br /> Signal turn-on for new or rebuilt control equipment will be permitted Monday through <br /> Thursday, between 9:00 a.m. to 3 p.m. the same day. <br /> 1-07.24 Rights of Way <br /> (July 23, 2015 APWA GSP) <br /> Delete this section and replace it with the following: <br /> Street Right of Way lines, limits of easements, and limits of construction permits are <br /> indicated in the Plans. The Contractor's construction activities shall be confined within these <br /> limits, unless arrangements for use of private property are made. <br /> Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of way <br /> and easements, both permanent and temporary, necessary for carrying out the work. <br /> Exceptions to this are noted in the Bid Documents or will be brought to the Contractor's <br /> attention by a duly issued Addendum. <br /> Whenever any of the work is accomplished on or through property other than public Right of <br /> Way, the Contractor shall meet and fulfill all covenants and stipulations of any easement <br /> agreement obtained by the Contracting Agency <br /> Community Transit Swift II BRT DRAFT Special Provisions SP5 <br /> November 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.