A <br /> 8-20.3(3)D Electrical Equipment Removals <br /> Removals associated with the electrical or ITS systems shall not be stockpiled within the job site without the <br /> Engineer's approval. <br /> 8-20.3(3)E Contracting Agency Owned Equipment <br /> Portions of the temporary or existing equipment to be removed shall be returned to the jurisdictional owners on <br /> behalf of the Contracting Agency. <br /> The following shall be disconnected, dismantled, and delivered to the locations specified herein for each bit item. <br /> All existing equipment that is to be removed shall not be stockpiled within the job site without the Engineer's <br /> approval. The following signal equipment shall be disconnected, dismantled, stacked separately, and delivered to the <br /> locations specified below: <br /> • Traffic Signal Standards and Mast Arms <br /> • Traffic Signal Controller Cabinets <br /> • Electrical Service Cabinet <br /> • Light Standards and Mast Arms <br /> • Emergency Vehicle Detectors <br /> • Vehicle and Pedestrian Displays and Mounting Hardware <br /> • Pedestrian Pushbuttons <br /> • Luminaires <br /> • Video Cameras and Mounting Hardware <br /> • Terminal Cabinets <br /> • Visors <br /> • Back Plates <br /> Equipment damaged during removal or delivery shall be repaired or replaced to the Engineer's satisfaction at no <br /> cost to the Contracting Agency. <br /> The Contractor shall be responsible for unloading the equipment where directed by the Engineer at the delivery site. <br /> Prior to the removal of any span wire from strain poles all associated vehicle and pedestrian signal heads, emergency <br /> vehicle detectors,video cameras, and signs shall be removed from each span. <br /> Video cameras shall be given to the Engineer upon their removal. The Contractor shall give the Engineer fourteen <br /> (14) calendar days advance written notice prior to delivery for removed materials to the agency's storage facilities. <br /> The controller cabinet specified for replacement in the Plans, shall not be removed until all associated electronic <br /> equipment is removed by WSDOT traffic signals personnel. All other equipment shall be removed by the <br /> Contractor, and delivered within 24 hours following removal, as specified below: <br /> Removals within City of Bothell <br /> 6 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />