My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> 8-20.3(3)D Electrical Equipment Removals <br /> Removals associated with the electrical or ITS systems shall not be stockpiled within the job site without the <br /> Engineer's approval. <br /> 8-20.3(3)E Contracting Agency Owned Equipment <br /> Portions of the temporary or existing equipment to be removed shall be returned to the jurisdictional owners on <br /> behalf of the Contracting Agency. <br /> The following shall be disconnected, dismantled, and delivered to the locations specified herein for each bit item. <br /> All existing equipment that is to be removed shall not be stockpiled within the job site without the Engineer's <br /> approval. The following signal equipment shall be disconnected, dismantled, stacked separately, and delivered to the <br /> locations specified below: <br /> • Traffic Signal Standards and Mast Arms <br /> • Traffic Signal Controller Cabinets <br /> • Electrical Service Cabinet <br /> • Light Standards and Mast Arms <br /> • Emergency Vehicle Detectors <br /> • Vehicle and Pedestrian Displays and Mounting Hardware <br /> • Pedestrian Pushbuttons <br /> • Luminaires <br /> • Video Cameras and Mounting Hardware <br /> • Terminal Cabinets <br /> • Visors <br /> • Back Plates <br /> Equipment damaged during removal or delivery shall be repaired or replaced to the Engineer's satisfaction at no <br /> cost to the Contracting Agency. <br /> The Contractor shall be responsible for unloading the equipment where directed by the Engineer at the delivery site. <br /> Prior to the removal of any span wire from strain poles all associated vehicle and pedestrian signal heads, emergency <br /> vehicle detectors,video cameras, and signs shall be removed from each span. <br /> Video cameras shall be given to the Engineer upon their removal. The Contractor shall give the Engineer fourteen <br /> (14) calendar days advance written notice prior to delivery for removed materials to the agency's storage facilities. <br /> The controller cabinet specified for replacement in the Plans, shall not be removed until all associated electronic <br /> equipment is removed by WSDOT traffic signals personnel. All other equipment shall be removed by the <br /> Contractor, and delivered within 24 hours following removal, as specified below: <br /> Removals within City of Bothell <br /> 6 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.