Laserfiche WebLink
Installed casing pipe shall be free from grease, dirt,rust, moisture and any other deleterious contaminants. <br /> Commercial concrete meeting the requirements of Section 6-02.3(2)B may be used to seal the casing. <br /> 8-20.3(6)Junction Boxes, Cable Vaults, and Pull boxes <br /> Section 8-20.3(6) is supplemented with the following: <br /> Unless otherwise noted in the Plans or approved by the Engineer, junction boxes, cable vaults and pull boxes shall <br /> not be placed within the traveled way or paved shoulders. <br /> All junction boxes, cable vaults, and pull boxes placed within the traveled way or paved shoulders shall be heavy- <br /> duty. <br /> Wiring shall not be pulled into any conduit until all associated junction boxes have been adjusted to, or installed in, <br /> their final grade and location, unless installation is necessary to maintain system operation. If wire is installed for <br /> this reason, sufficient slack shall be left to allow for future adjustment. <br /> Prior to installing new cables or reinstalling existing cables into new or existing cable vaults, pull boxes or junction <br /> boxes, the cable vault, pull box or junction box shall be cleaned of all dirt and debris. <br /> When junction boxes, cable vaults and pull boxes are installed or adjusted prior to construction of finished grade, <br /> pre-molded joint filler for expansion joints may be placed around the junction boxes, cable vaults and pull boxes. <br /> The joint filler shall be removed prior to adjustment to finished grade. <br /> When junction boxes, cable vaults or pull boxes are adjusted to finished grade, the six-inch gravel pad requirements <br /> shall be maintained. When existing junction boxes pull boxes or cable vaults do not have this gravel pad, or the <br /> gravel pad does not meet these specifications, a gravel pad, meeting these specifications shall be installed as part of <br /> the adjustment to finished grade. <br /> If junction boxes are placed in the sidewalk, they shall not be placed closer than 12 inches from the edge of any <br /> sidewalk or sidewalk joint. The frame and lid shall be from 0 to 3/16 inch below a straight edge laid across the <br /> sidewalk, and the lid shall be flat to a maximum of 1/16 inch positive camber. Premolded joint filler for expansion <br /> joints shall be placed around junction boxes installed in sidewalks. <br /> Heavy-duty Type 4, 5 and 6 junction boxes, cable vaults and pull boxes shall be installed in accordance with the <br /> following: <br /> 1. Excavation shall be sufficient to leave one foot in the clear between their outer surface and the earth bank. <br /> 2. Junction boxes, cable vaults and pull boxes shall be installed on a level 6-inch layer of crushed surfacing top <br /> course,in accordance with 9-03.9(3), placed on a compacted or undisturbed foundation. The crushed surfacing shall <br /> be compacted in accordance with Section 2-09.3(1)E. <br /> 14 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />