Laserfiche WebLink
r <br /> PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> CT SWIFT II BRT— Boeing to Canyon Park Stations 60% Review <br /> Job Charge: Reviewed By: Office&Mail Stop: Phone: Date: Sr <br /> WO# Euneka Richards Traffic Operations 425-257-8926 8-2-16 1 of 5 <br /> # ShtiPg Reviewer's Comment Designer's Response Init. <br /> 1 TSG-1 General note 5 calls for a 9"x12" R10-3B sign installation for APS ped The Everett APS sign spec will be called Casseday <br /> TS10.2 pushbutton assemblies. The City of Everett specs 9"x15" R103e sign out specifically for all applicable City of <br /> installations for APS ped pushbutton assemblies. Please either change Everett intersections. <br /> general note 5, or call out the Everett APS sign spec on sheet TS10.2. <br /> 2 TS-9.1 The City of Everett mounts APS buttons at 36" instead of 42". Please change The City of Everett APS button mounting Casseday <br /> C Note 2 to install the center of the pushbutton 36" instead of 42"above the height spec for 36"will be included. <br /> surface. <br /> 3 TS-10.2 The City of Everett mounts APS buttons at 36" instead of 42". Please change Intersection ramp design has been Casseday <br /> Pole Notes 1-5 to install the center of the pushbutton 36" instead of 42" modified and ramp modifications are <br /> above the sidewalk. needed at only one corner. The Swift II <br /> project will include adjustments for PPB <br /> at one corner and will replace all <br /> pedestrian signal heads with countdown <br /> signal heads at the intersection. No <br /> change to APS is planned, since this <br /> would require reconstructing new ramps <br /> at the other three corners. <br /> 4 TS-10.2 The City of Everett mounts APS buttons at 36" instead of 42". Please change The City of Everett APS button mounting Casseday <br /> C Note 2 to install the center of the pushbutton 36" instead of 42"above the height spec for 36"will be called out <br /> sidewalk. specifically for all City of Everett <br /> intersections. <br /> 5 TS-10.2 Per MUTCD 4E.11 paragraph 20 please remove the "Street SW"from "112th Only Countdown heads will be included Casseday <br /> Street SW" in all messages in the Voice to walk message Schedule in the design, due to limited ramp <br /> reconstruction in the NE quadrant, so no <br /> messages will be included for the <br /> existing "dummy" buttons that may be <br /> relocated on that corner. <br /> Swift II BRT Everett Comment Sheet_60 Stations_OtakResponse.docx <br />