My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> CT SWIFT II BRT— Boeing to Canyon Park Stations 60% Review <br /> Job Charge: Reviewed By: Office&Mail Stop: Phone: Date: Spapt <br /> WO# Euneka Richards Traffic Operations 425-257-8926 8-2-16 of <br /> # Sht/Pg Reviewer's Comment Designer's Response Init. <br /> 6 TS-10.2 Per MUTCD 4E.11 paragraph 20 please remove the "Road"from "Airport See response for Comment#5. Casseday <br /> Road" in all messages in the Voice to walk message Schedule <br /> 7 TS-10.2 Please show the ped push button symbol on the opposite side of the PPB See response for Comment#5. Casseday <br /> pole such that the APS station is facing the intersection <br /> 8 TS-11.1 Please review the vehicle signal head diagram versus existing conditions Signal modifications at this location will Casseday <br /> and versus the plan sheet. I believe head 43 is not depicted correctly, head be limited to installation of two loops in <br /> 34 is listed twice in 2 different configurations,and you are missing a the vicinity of the northbound bus station <br /> westbound follow through head on the signal pole in the NW corner. at this location. Signal head references <br /> are not relevant to the design and will be <br /> eliminated. <br /> 9 TS-11.1 Replace all PED heads with count down models. APS/PPB Poles all corners. Per meeting on 9/7/16 between Ryan Casseday <br /> Sass and June DeVoll, Community <br /> Transit and the Swift II project will not <br /> replace pedestrian signal heads or add <br /> APS/PPB at the Kasch Park Road <br /> signal. <br /> 10 TS-11.1 Dual indication (only 4 sections) See response for Comment#8. Casseday <br /> 11 C3.27 Our data shows damaged pavement from SWIFT I stop locations extends Field data from the existing Swift stations Otak <br /> C3.29 100' in front of current SWIFT stations. Please extend the cement concrete along SR 99 was analyzed to determine <br /> C3.30 pad in front of each stop from 60'to 100' adding 20'on each side of the the need for extended concrete pads. It <br /> C3.31 currently shown pad. appears that the proposed concrete pads <br /> C3.33 will be sufficient based on existing <br /> pavement rutting. Per meeting on 9/7/16 <br /> between Ryan Sass and June DeVoll, <br /> the design team will evaluate on a site by <br /> site basis to confirm these dimensions. <br /> Swift II BRT Everett Comment Sheet 60 Stations_OtakResponse.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.