My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION TO THE SPECIAL PROVISIONS <br /> (August 14, 2013 APWA GSP) <br /> The work on this project shall be accomplished in accordance with the Standard Specifications <br /> for Road, Bridge and Municipal Construction, 2016 edition, as issued by the Washington State <br /> Department of Transportation (WSDOT) and the American Public Works Association (APWA), <br /> Washington State Chapter (hereafter "Standard Specifications"). The Standard Specifications, <br /> as modified or supplemented by the Amendments to the Standard Specifications and these <br /> Special Provisions, all of which are made a part of the Contract Documents, shall govern all of <br /> the Work. <br /> These Special Provisions are made up of both General Special Provisions (GSPs) from various <br /> sources, which may have project-specific fill-ins; and project-specific Special Provisions. Each <br /> Provision either supplements, modifies, or replaces the comparable Standard Specification, or is <br /> a new Provision. The deletion, amendment, alteration, or addition to any subsection or portion <br /> of the Standard Specifications is meant to pertain only to that particular portion of the section, <br /> and in no way should it be interpreted that the balance of the section does not apply. <br /> The project-specific Special Provisions are not labeled as such. The GSPs are labeled under <br /> the headers of each GSP, with the effective date of the GSP and its source. For example: <br /> (March 8, 2013 APWA GSP) <br /> (April 1, 2013 WSDOT GSP) <br /> (December 2016 CT GSP) <br /> Also incorporated into the Contract Documents by reference are: <br /> • Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted <br /> edition, with Washington State modifications, if any <br /> • Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current <br /> edition <br /> Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> Swift Green Line—Corridor Stations Special Provisions SP1 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.