My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> DESCRIPTION OF WORK <br /> (March 13, 1995 WSDOT GSP) <br /> This contract provides for improvements to construct site, roadway and signal improvements, <br /> and station shelter installation at thirty-three (33) bus rapid transit passenger stations, and other <br /> work, all in accordance with the attached Contract Plans, these Contract Provisions, and the <br /> Standard Specifications. Work is located in the cities of Everett, Mill Creek, and Bothell; <br /> unincorporated Snohomish County; and State Route 96 and 527 right-of-way (WSDOT). Site <br /> construction and roadway/signal improvements include temporary erosion and sedimentation <br /> control; temporary traffic control including providing temporary routing/facilities for pedestrians <br /> and bicycles; surveying; removal of structures and obstructions; excavation and trenching; <br /> storm drainage and utilities; water main and sanitary sewer relocation; curb and gutter, and <br /> sidewalk; concrete platform; HMA and concrete pavement; cast-in-place and gravity block <br /> retaining walls; signals and illumination; signage and pavement marking; driver restroom at <br /> Canyon Park P&R; and landscaping and property restoration. Work also includes the assembly <br /> and installation of owner furnished shelters and miscellaneous electronic equipment. <br /> 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions <br /> (January 4, 2016 APWA GSP) <br /> Delete the heading Completion Dates and the three paragraphs that follow it, and replace them <br /> with the following: <br /> Dates <br /> Bid Opening Date <br /> The date on which the Contracting Agency publicly opens and reads the Bids. <br /> Award Date <br /> The date of the formal decision of the Contracting Agency to accept the lowest <br /> responsible and responsive Bidder for the Work. <br /> Contract Execution Date <br /> The date the Contracting Agency officially binds the Agency to the Contract. <br /> Notice to Proceed Date <br /> The date stated in the Notice to Proceed on which the Contract time begins. <br /> Substantial Completion Date <br /> The day the Engineer determines the Contracting Agency has full and unrestricted use <br /> and benefit of the facilities, both from the operational and safety standpoint, any <br /> remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> replacement of temporary substitute facilities, plant establishment periods, or correction <br /> or repair remains for the Physical Completion of the total Contract. <br /> Swift Green Line—Corridor Stations Special Provisions SP2 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.