My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents <br /> See definition for"Contract". <br /> Contract Time <br /> The period of time established by the terms and conditions of the Contract within which the <br /> Work must be physically completed. <br /> Notice of Award <br /> The written notice from the Contracting Agency to the successful Bidder signifying the <br /> Contracting Agency's acceptance of the Bid Proposal. <br /> Notice to Proceed <br /> The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> and directing the Contractor to proceed with the Work and establishing the date on which <br /> the Contract time begins. <br /> Traffic <br /> Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> equestrian traffic. <br /> 1-02 BID PROCEDURES AND CONDITIONS <br /> 1-02.1 Prequalification of Bidders <br /> Delete this section and replace it with the following: <br /> 1-02.1 Qualifications of Bidder <br /> (January 24, 2011 APWA GSP) <br /> Before award of a public works contract, a bidder must meet at least the minimum <br /> qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to <br /> be awarded a public works project. <br /> Add the following new section: <br /> 1-02.1(1) Supplemental Qualifications Criteria <br /> (January 4, 2016 APWA GSP) <br /> In addition, the Contracting Agency has established Contracting Agency-specific and/or <br /> project-specific supplemental criteria, in accordance with RCW 39.04.350(2), for determining <br /> Bidder responsibility, including the basis for evaluation and the deadline for appealing a <br /> determination that a Bidder is not responsible. These criteria are contained in Section 1- <br /> 02.14 Option C of these Special Provisions. <br /> 1-02.2 Plans and Specifications <br /> (June 27, 2011 APWA GSP) <br /> Delete this section and replace it with the following: <br /> Swift Green Line—Corridor Stations Special Provisions SP4 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.