Laserfiche WebLink
Information as to where Bid Documents can be obtained or reviewed can be found in the <br /> Call for Bids (Advertisement for Bids) for the work. <br /> After award of the contract, plans and specifications will be issued to the Contractor at no <br /> cost as detailed below: <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 5 Furnished automatically <br /> upon award. <br /> Contract Provisions 5 Furnished automatically <br /> upon award. <br /> Large plans (e.g., 22" x 0 Furnished only upon <br /> 34") request. <br /> Additional plans and Contract Provisions may be obtained by the Contractor from the source <br /> stated in the Call for Bids, at the Contractor's own expense. <br /> 1-02.4 Examination of Plans, Specifications and Site of Work <br /> 1-02.4(1) General <br /> (January 5, 2015 WSDOT GSP) <br /> Section 1-02.4(1) is supplemented with the following: <br /> The Contracting Agency has included a partially filled in Washington State Department of <br /> Ecology (Ecology) Transfer of Coverage (Ecology form ECY 02087a) for the Construction <br /> Stormwater General Permit (CSWGP) as part of the Bid Documents. As a condition of <br /> Section 1-03.3, Execution of Contract, the Contractor is required to complete sections I, Ill, <br /> and VIII of the Transfer of Coverage and return the form to the Contracting Agency. <br /> The Contracting Agency is responsible for compliance with the CSWGP until the end of day <br /> that the Contract is executed. Beginning on the day after the Contract is executed the <br /> Contractor shall assume complete legal responsibility for compliance with the CSWGP and <br /> full implementation of all conditions of the CSWGP as they apply to the contract Work. <br /> 1-02.4(2) Subsurface Information <br /> (December 2016 CT GSP) <br /> The second sentence in the first paragraph is revised to read: <br /> The project Geotechnical Report has been included in Appendix E and shall be <br /> considered as part of the Contract. <br /> Swift Green Line—Corridor Stations Special Provisions SP5 <br /> May 2017 <br />