Laserfiche WebLink
1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> (July 23, 2015 APWA GSP) <br /> Delete this section, and replace it with the following: <br /> After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> withdraw, revise, or supplement it if: <br /> 1. The Bidder submits a written request signed by an authorized person and <br /> physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 2. The Contracting Agency receives the request before the time set for receipt of Bid <br /> Proposals, and <br /> 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting <br /> Agency before the time set for receipt of Bid Proposals. <br /> If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> unopened Proposal package to the Bidder. The Bidder must then submit the revised or <br /> supplemented package in its entirety. If the Bidder does not submit a revised or <br /> supplemented package, then its bid shall be considered withdrawn. <br /> Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br /> recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> 1-02.11 Combination and Multiple Proposals <br /> (December 2016 CT GSP) <br /> Delete this section in its entirety. <br /> 1-02.12 Public Opening of Proposals <br /> (August 3, 2015 WSDOT GSP) <br /> Section 1-02.12 is supplemented with the following: <br /> Date of Opening Bids <br /> The bid opening date for this project is ***2:00 PM, Wednesday, June 28th ***. Bids <br /> received will be publicly opened and read after 2:00:59 P. M. Pacific Time on this date. <br /> (December 2016 CT GSP) <br /> Section 1-02 is supplemented with the following: <br /> Protest Procedures <br /> Refer to the link below for additional information. <br /> www.communitvtransit.orq/procurement. <br /> Swift Green Line—Corridor Stations Special Provisions SP7 <br /> May 2017 <br />