My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> (July 23, 2015 APWA GSP) <br /> Delete this section, and replace it with the following: <br /> After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> withdraw, revise, or supplement it if: <br /> 1. The Bidder submits a written request signed by an authorized person and <br /> physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 2. The Contracting Agency receives the request before the time set for receipt of Bid <br /> Proposals, and <br /> 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting <br /> Agency before the time set for receipt of Bid Proposals. <br /> If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> unopened Proposal package to the Bidder. The Bidder must then submit the revised or <br /> supplemented package in its entirety. If the Bidder does not submit a revised or <br /> supplemented package, then its bid shall be considered withdrawn. <br /> Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br /> recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> 1-02.11 Combination and Multiple Proposals <br /> (December 2016 CT GSP) <br /> Delete this section in its entirety. <br /> 1-02.12 Public Opening of Proposals <br /> (August 3, 2015 WSDOT GSP) <br /> Section 1-02.12 is supplemented with the following: <br /> Date of Opening Bids <br /> The bid opening date for this project is ***2:00 PM, Wednesday, June 28th ***. Bids <br /> received will be publicly opened and read after 2:00:59 P. M. Pacific Time on this date. <br /> (December 2016 CT GSP) <br /> Section 1-02 is supplemented with the following: <br /> Protest Procedures <br /> Refer to the link below for additional information. <br /> www.communitvtransit.orq/procurement. <br /> Swift Green Line—Corridor Stations Special Provisions SP7 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.