Laserfiche WebLink
1-02.5 Proposal Forms <br /> (December 2016 CT GSP) <br /> Delete this section and replace it with the following: <br /> The Proposal Form will identify the project and its location and describe the work. It will also <br /> list estimated quantities, units of measurement, the items of work, and the materials to be <br /> furnished at the unit bid prices. The bidder shall complete all spaces on the proposal form. <br /> 1-02.6 Preparation of Proposal <br /> (December 2016 CT GSP) <br /> Delete the fourth paragraph of this section beginning with "The Bidder shall submit with the Bid <br /> a completed Disadvantaged Business Enterprise (DBE) Utilization Certification...". <br /> 1-02.7 Bid Deposit <br /> (December 2016 CT GSP) <br /> Supplement this section with the following: <br /> Bid bonds shall contain the following: <br /> 1. Contracting Agency-assigned number for the project; <br /> 2. Name of the project; <br /> 3. The Contracting Agency named as obligee; <br /> 4. The amount of the bid bond stated either as a dollar figure or as a percentage which <br /> represents five percent of the maximum bid amount that could be awarded; <br /> 5. Signature of the bidder's officer empowered to sign official statements. The signature of <br /> the person authorized to submit the bid should agree with the signature on the bond, and <br /> the title of the person must accompany the said signature; <br /> 6. The signature of the surety's officer empowered to sign the bond and the power of <br /> attorney. <br /> Bidder must use the bond form included in the Contract Provisions. <br /> Cash will not be accepted for a bid deposit. <br /> 1-02.8(2) Lobbying Certification <br /> (December 2016 CT GSP) <br /> Delete this section, and replace with the following. <br /> FEDERAL TRANSIT ADMINISTRATION (FTA) REQUIREMENTS <br /> Contractor shall be compliant with FTA Provisions additional provisions due to the fact <br /> that FTA Federal grant funding is being used for this project. FTA Provisions are <br /> included in the Contract Forms section of these Specifications. <br /> Swift Green Line—Corridor Stations Special Provisions SP6 <br /> May 2017 <br />