My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stationing on roadway N/A ±0.1 feet <br /> Alignment on roadway N/A ±0.04 feet <br /> Surfacing grade stakes ±0.01 feet ±0.5 feet <br /> (parallel to alignment) <br /> ±0.1 feet <br /> (normal to alignment) <br /> Roadway paving pins for <br /> surfacing or paving ±0.01 feet ±0.2 feet <br /> (parallel to alignment) <br /> ±0.1 feet <br /> (normal to alignment) <br /> Stationing on structures ±0.2 feet <br /> Alignment on structures ±0.2 feet <br /> The Contracting Agency may spot-check the Contractor's surveying. These spot-checks <br /> will not change the requirements for normal checking by the Contractor. <br /> When staking roadway alignment and stationing, the Contractor shall perform independent <br /> checks from different secondary control to ensure that the points staked are within the <br /> specified survey accuracy tolerances. <br /> The Contractor shall calculate coordinates for the alignment. The Contracting Agency will <br /> verify these coordinates prior to issuing approval to the Contractor for commencing with the <br /> work. The Contracting Agency will require up to seven calendar days from the date the <br /> data is received. <br /> Contract work to be performed using contractor-provided stakes shall not begin until the <br /> stakes are approved by the Contracting Agency. Such approval shall not relieve the <br /> Contractor of responsibility for the accuracy of the stakes. <br /> Stakes shall be marked in accordance with Standard Plan A10.10. When stakes are <br /> needed that are not described in the Plans, then those stakes shall be marked, at no <br /> additional cost to the Contracting Agency as ordered by the Engineer. <br /> Payment <br /> Payment will be made in accordance with Section 1-04.1 for the following bid item when <br /> included in the proposal: <br /> " Surveying", lump sum. <br /> The lump sum contract price for "Surveying" shall be full pay for all labor, equipment, <br /> materials, and supervision utilized to perform the Work specified, including any resurveying, <br /> checking, correction of errors, replacement of missing or damaged stakes, and coordination <br /> efforts. <br /> Section 1-05.4 is supplemented with the following: <br /> Surveying shall be performed under the supervision of a Professional Land <br /> Surveyor(PLS) registered in the State of Washington. <br /> Swift Green Line—Corridor Stations Special Provisions SP20 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.