My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor's request shall list the specific items of work that remain to be completed in <br /> order to reach physical completion. The Engineer will schedule an inspection of the work <br /> with the Contractor to determine the status of completion. The Engineer may also establish <br /> the Substantial Completion Date unilaterally. <br /> If, after this inspection, the Engineer concurs with the Contractor that the work is <br /> substantially complete and ready for its intended use, the Engineer, by written notice to the <br /> Contractor, will set the Substantial Completion Date. If, after this inspection the Engineer <br /> does not consider the work substantially complete and ready for its intended use, the <br /> Engineer will, by written notice, so notify the Contractor giving the reasons therefor. <br /> Upon receipt of written notice concurring in or denying substantial completion, whichever is <br /> applicable, the Contractor shall pursue vigorously, diligently and without unauthorized <br /> interruption, the work necessary to reach Substantial and Physical Completion. The <br /> Contractor shall provide the Engineer with a revised schedule indicating when the <br /> Contractor expects to reach substantial and physical completion of the work. <br /> The above process shall be repeated until the Engineer establishes the Substantial <br /> Completion Date and the Contractor considers the work physically complete and ready for <br /> final inspection. <br /> 1-05.11(2) Final Inspection and Physical Completion Date <br /> When the Contractor considers the work physically complete and ready for final inspection, <br /> the Contractor by written notice, shall request the Engineer to schedule a final inspection. <br /> The Engineer will set a date for final inspection. The Engineer and the Contractor will then <br /> make a final inspection and the Engineer will notify the Contractor in writing of all particulars <br /> in which the final inspection reveals the work incomplete or unacceptable. The Contractor <br /> shall immediately take such corrective measures as are necessary to remedy the listed <br /> deficiencies. Corrective work shall be pursued vigorously, diligently, and without interruption <br /> until physical completion of the listed deficiencies. This process will continue until the <br /> Engineer is satisfied the listed deficiencies have been corrected. <br /> If action to correct the listed deficiencies is not initiated within 7 days after receipt of the <br /> written notice listing the deficiencies, the Engineer may, upon written notice to the <br /> Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br /> Section 1-05.7. <br /> The Contractor will not be allowed an extension of contract time because of a delay in the <br /> performance of the work attributable to the exercise of the Engineer's right hereunder. <br /> Upon correction of all deficiencies, the Engineer will notify the Contractor and the <br /> Contracting Agency, in writing, of the date upon which the work was considered physically <br /> complete. That date shall constitute the Physical Completion Date of the contract, but shall <br /> not imply acceptance of the work or that all the obligations of the Contractor under the <br /> contract have been fulfilled. <br /> Swift Green Line—Corridor Stations Special Provisions SP23 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.