My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-05.7 Removal of Defective and Unauthorized Work <br /> (October 1, 2005 APWA GSP) <br /> Supplement this section with the following: <br /> If the Contractor fails to remedy defective or unauthorized work within the time specified in a <br /> written notice from the Engineer, or fails to perform any part of the work required by the <br /> Contract Documents, the Engineer may correct and remedy such work as may be identified <br /> in the written notice, with Contracting Agency forces or by such other means as the <br /> Contracting Agency may deem necessary. <br /> If the Contractor fails to comply with a written order to remedy what the Engineer determines <br /> to be an emergency situation, the Engineer may have the defective and unauthorized work <br /> corrected immediately, have the rejected work removed and replaced, or have work the <br /> Contractor refuses to perform completed by using Contracting Agency or other forces. An <br /> emergency situation is any situation when, in the opinion of the Engineer, a delay in its <br /> remedy could be potentially unsafe, or might cause serious risk of loss or damage to the <br /> public. <br /> Direct or indirect costs incurred by the Contracting Agency attributable to correcting and <br /> remedying defective or unauthorized work, or work the Contractor failed or refused to <br /> perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from <br /> monies due, or to become due, the Contractor. Such direct and indirect costs shall include in <br /> particular, but without limitation, compensation for additional professional services required, <br /> and costs for repair and replacement of work of others destroyed or damaged by correction, <br /> removal, or replacement of the Contractor's unauthorized work. <br /> No adjustment in contract time or compensation will be allowed because of the delay in the <br /> performance of the work attributable to the exercise of the Contracting Agency's rights <br /> provided by this Section. <br /> The rights exercised under the provisions of this section shall not diminish the Contracting <br /> Agency's right to pursue any other avenue for additional remedy or damages with respect to <br /> the Contractor's failure to perform the work as required. <br /> 1-05.11 Final Inspection <br /> Delete this section and replace it with the following: <br /> 1-05.11 Final Inspections and Operational Testing <br /> (October 1, 2005 APWA GSP) <br /> 1-05.11(1) Substantial Completion Date <br /> When the Contractor considers the work to be substantially complete, the Contractor shall <br /> so notify the Engineer and request the Engineer establish the Substantial Completion Date. <br /> Swift Green Line—Corridor Stations Special Provisions SP22 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.