1-05.7 Removal of Defective and Unauthorized Work <br /> (October 1, 2005 APWA GSP) <br /> Supplement this section with the following: <br /> If the Contractor fails to remedy defective or unauthorized work within the time specified in a <br /> written notice from the Engineer, or fails to perform any part of the work required by the <br /> Contract Documents, the Engineer may correct and remedy such work as may be identified <br /> in the written notice, with Contracting Agency forces or by such other means as the <br /> Contracting Agency may deem necessary. <br /> If the Contractor fails to comply with a written order to remedy what the Engineer determines <br /> to be an emergency situation, the Engineer may have the defective and unauthorized work <br /> corrected immediately, have the rejected work removed and replaced, or have work the <br /> Contractor refuses to perform completed by using Contracting Agency or other forces. An <br /> emergency situation is any situation when, in the opinion of the Engineer, a delay in its <br /> remedy could be potentially unsafe, or might cause serious risk of loss or damage to the <br /> public. <br /> Direct or indirect costs incurred by the Contracting Agency attributable to correcting and <br /> remedying defective or unauthorized work, or work the Contractor failed or refused to <br /> perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from <br /> monies due, or to become due, the Contractor. Such direct and indirect costs shall include in <br /> particular, but without limitation, compensation for additional professional services required, <br /> and costs for repair and replacement of work of others destroyed or damaged by correction, <br /> removal, or replacement of the Contractor's unauthorized work. <br /> No adjustment in contract time or compensation will be allowed because of the delay in the <br /> performance of the work attributable to the exercise of the Contracting Agency's rights <br /> provided by this Section. <br /> The rights exercised under the provisions of this section shall not diminish the Contracting <br /> Agency's right to pursue any other avenue for additional remedy or damages with respect to <br /> the Contractor's failure to perform the work as required. <br /> 1-05.11 Final Inspection <br /> Delete this section and replace it with the following: <br /> 1-05.11 Final Inspections and Operational Testing <br /> (October 1, 2005 APWA GSP) <br /> 1-05.11(1) Substantial Completion Date <br /> When the Contractor considers the work to be substantially complete, the Contractor shall <br /> so notify the Engineer and request the Engineer establish the Substantial Completion Date. <br /> Swift Green Line—Corridor Stations Special Provisions SP22 <br /> May 2017 <br />