Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> CT SWIFT II BRT— Boeing to Canyon Park Stations 60% Review <br /> Job Charge: Reviewed By: Office&Mail Stop: Phone: Date: S <br /> WO# Euneka Richards Traffic Operations 425-257-8926 8-2-16 5 of 5 <br /> # ShtIPg Reviewer's Comment Designer's Response Init. <br /> 24 C3.29 Install drop lane line after bus stop. This lane will continue as an HOV lane Otak <br /> after the station. The channelization will <br /> be reviewed for consistency with the <br /> existing channelization along the Airport <br /> Road HOV lane. <br /> 25 C3.29 Install 8"white line with crosshatch to guide cars turning right onto Airport Rd See response for Comment#13. Otak <br /> out of the bus lane. <br /> 26 C3.29 Delete green highlighted line. Noted. Line will be deleted for 90%. Otak <br /> 27 C3.30 If bike symbol is removed, then replace. Removed bike symbols will be replaced Otak <br /> and/or relocated consistent with the <br /> other Swift II stations. Also see <br /> response to Comment#13. <br /> 28 C3.33 Remove existing bike symbol. TESC/Demolition plan sheet C2.33 Otak <br /> shows bike symbol removal. <br /> Swift II BRT Everett Comment Sheet_60 Stations_OtakResponse.docx <br />