Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> CT SWIFT II BRT— Boeing to Canyon Park Stations 60% Review <br /> Job Charge: Reviewed By: Office&Mail Stop: Phone: Date: S el <br /> WO# Euneka Richards Traffic Operations 425-257-8926 8-2-16 4....(?1 <br /> 5 <br /> # Sht/Pg Reviewer's Comment Designer's Response Init. <br /> 17 C3.27 Install type 6SL arrows. Noted. Arrows will be added at 90%. Otak <br /> 18 C3.27 How will bike lane be tapered up from 4.4 feet to 5.2 feet? Bike lane will be adjusted to have a Otak <br /> C3.28 constant width (+/-5 feet)to match the <br /> existing bike lane width at 90%. <br /> 19 C3.29 Reverse viewport pane order. The viewport pane order will be revised Otak <br /> C3.31 for 90%. <br /> C4.29 <br /> C4.31 <br /> 20 C3.29 Show outlined (diamond), not solid throughout. Noted. We will adjust the High Otak <br /> C3.33 Occupancy Vehicle Lane Symbol to be <br /> shown per WSDOT Std. Plan M-7.50-01 <br /> at 90%. <br /> 21 C3.29 Consider removing bike stripe. See response for Comment#13. Otak <br /> 22 C3.29 Install BUS ONLY marking by traffic island. We will further evaluate channelization Otak <br /> adjacent to the traffic island; the area <br /> adjacent to the traffic island is not <br /> intended to be a traffic lane. Revised <br /> channelization will be provided for 90%. <br /> 23 C3.29 Extend dotted wide line to traffic island. Additional channelization for the Otak <br /> southbound to westbound right turn lane <br /> will be evaluated. A dotted wide lane <br /> line and yield line symbols will be <br /> considered. Revised channelization will <br /> be provided for 90%. <br /> Swift II BRT Everett Comment Sheet 60 Stations_OtakResponse.docx <br />