My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-05.15 Method of Serving Notices <br /> (March 25, 2009 APWA GSP) <br /> Revise the second paragraph to read: <br /> All correspondence from the Contractor shall be directed to the Project Engineer. All <br /> correspondence from the Contractor constituting any notification, notice of protest, notice of <br /> dispute, or other correspondence constituting notification required to be furnished under the <br /> Contract, must be in paper format, hand delivered or sent via mail delivery service to the <br /> Project Engineer's office. Electronic copies such as e-mails or electronically delivered copies <br /> of correspondence will not constitute such notice and will not comply with the requirements <br /> of the Contract. <br /> Add the following new section: <br /> 1-05.16 Water and Power <br /> (October 1, 2005 APWA GSP) <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power and <br /> water necessary for the performance of the work, unless the contract includes power and <br /> water as a pay item. <br /> Add the following new section: <br /> 1-05.18 Record Drawings NEW <br /> The Contractor shall maintain one set of half size (11x17) plans for Record Drawings, <br /> updated with clear and accurate red-lined field revisions on a daily basis, and within 2 <br /> business days after receipt of information that a change in Work has occurred. The <br /> Contractor shall not conceal any work until the required information is recorded. <br /> This Record Drawing set shall be used for this purpose alone, shall be kept separate from <br /> other Plan sheets, and shall be clearly marked as Record Drawings. These Record <br /> Drawings shall be kept on site at the Contractor's field office, and shall be available for <br /> review by the Contracting Agency at all times. <br /> The preparation and upkeep of the Record Drawings is to be the assigned responsibility of a <br /> single, experienced, and qualified individual. The quality of the Record Drawings, in terms <br /> of accuracy, clarity, and completeness, is to be adequate to allow the Contracting Agency to <br /> modify the computer-aided drafting (CAD) Contract Drawings to produce a complete set of <br /> Record Drawings for the Contracting Agency without further investigative effort by the <br /> Contracting Agency. <br /> The Record Drawing markups shall document all changes in the Work, both concealed and <br /> visible. Items that must be shown on the markups include but are not limited to: <br /> • Actual dimensions, arrangement, and materials used when different than shown in the <br /> Plans. <br /> Swift Green Line—Corridor Stations Special Provisions SP26 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.