My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-07.5(3) State Department of Ecology <br /> (April 4, 2016 WSDOT GSP) <br /> Section 1-07.5(3) is supplemented with the following: <br /> 9. Should a violation of the CSWGP occur(also referred to as a noncompliance event), the <br /> Contractor shall immediately notify the Engineer and WSDOT Form 422-011 Contractor <br /> ECAP Report shall be submitted to the Engineer within 48 hours of the violation. <br /> 10. Once Physical Completion has been given the Contractor shall prepare a Notice of <br /> Termination (Ecology form ECY 020-87). The Contractor shall submit the Notice of <br /> Termination electronically to the Engineer in a PDF format a minimum of 7 calendar days <br /> prior to submitting the Notice of Termination to Ecology. <br /> 11. The Contractor shall submit copies of all correspondence with Ecology electronically to <br /> the Engineer in a PDF format within four calendar days. <br /> 1-07.6 Permits And Licenses <br /> Section 1-07.6 is supplemented with the following: <br /> The Contracting Agency has applied for the below-listed permit(s)for this project. All <br /> contacts with the permitting agency concerning the below-listed permit(s) shall be through <br /> the Engineer. The Contractor shall obtain additional permits as necessary. All costs to <br /> obtain and comply with additional permits shall be included in the applicable bid items for <br /> the work involved. <br /> Copies of these permits are required to be onsite at all times. <br /> *** <br /> PERMITS BY COMMUNITY TRANSIT <br /> City of Bothell— Building and ROW Permits <br /> City of Mill Creek— Building and ROW Permits <br /> City of Everett— Building and Grading Permits <br /> Snohomish County Planning —Building and Land Use Permits <br /> Snohomish County Public Works—ROW Permit <br /> WSDOT—General Permit <br /> *** <br /> Section 1-07.6 is supplemented with the following: <br /> (December 2016 CT GSP) <br /> PERMITS BY CONTRACTOR NEW <br /> Community Transit has submitted and will pay for the permits listed above for the project. <br /> The Contractor shall be solely responsible to obtain and pay for any additional permits or <br /> fees. <br /> Submittal of Site Specific Traffic Control Plans for review and approval, and a Business <br /> License is required by the jurisdictions prior to obtaining construction permits. <br /> Swift Green Line—Corridor Stations Special Provisions SP42 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.