1-07.5(3) State Department of Ecology <br /> (April 4, 2016 WSDOT GSP) <br /> Section 1-07.5(3) is supplemented with the following: <br /> 9. Should a violation of the CSWGP occur(also referred to as a noncompliance event), the <br /> Contractor shall immediately notify the Engineer and WSDOT Form 422-011 Contractor <br /> ECAP Report shall be submitted to the Engineer within 48 hours of the violation. <br /> 10. Once Physical Completion has been given the Contractor shall prepare a Notice of <br /> Termination (Ecology form ECY 020-87). The Contractor shall submit the Notice of <br /> Termination electronically to the Engineer in a PDF format a minimum of 7 calendar days <br /> prior to submitting the Notice of Termination to Ecology. <br /> 11. The Contractor shall submit copies of all correspondence with Ecology electronically to <br /> the Engineer in a PDF format within four calendar days. <br /> 1-07.6 Permits And Licenses <br /> Section 1-07.6 is supplemented with the following: <br /> The Contracting Agency has applied for the below-listed permit(s)for this project. All <br /> contacts with the permitting agency concerning the below-listed permit(s) shall be through <br /> the Engineer. The Contractor shall obtain additional permits as necessary. All costs to <br /> obtain and comply with additional permits shall be included in the applicable bid items for <br /> the work involved. <br /> Copies of these permits are required to be onsite at all times. <br /> *** <br /> PERMITS BY COMMUNITY TRANSIT <br /> City of Bothell— Building and ROW Permits <br /> City of Mill Creek— Building and ROW Permits <br /> City of Everett— Building and Grading Permits <br /> Snohomish County Planning —Building and Land Use Permits <br /> Snohomish County Public Works—ROW Permit <br /> WSDOT—General Permit <br /> *** <br /> Section 1-07.6 is supplemented with the following: <br /> (December 2016 CT GSP) <br /> PERMITS BY CONTRACTOR NEW <br /> Community Transit has submitted and will pay for the permits listed above for the project. <br /> The Contractor shall be solely responsible to obtain and pay for any additional permits or <br /> fees. <br /> Submittal of Site Specific Traffic Control Plans for review and approval, and a Business <br /> License is required by the jurisdictions prior to obtaining construction permits. <br /> Swift Green Line—Corridor Stations Special Provisions SP42 <br /> May 2017 <br />