Laserfiche WebLink
The following addresses and telephone numbers of utility companies known or suspected of <br /> having facilities adjacent to the project site are supplied for the Contractor's convenience: <br /> Snohomish County PUD#1 Alderwood Water&Wastewater District <br /> 1802 75th Street SW 3626 156th Street SW <br /> Everett, WA 98206 Lynnwood, WA 98087 <br /> Attn: John Gregory Attn: Catherine Forrest(Const. Manager) <br /> Telephone: (425) 783-8391 Telephone: (425) 743-4605 <br /> Dispatch: (425) 787-0250 <br /> Comcast Cable Silver Lake Water & Sewer District <br /> 1525 75th Street SW, Suite 200 15205 41st Avenue SE <br /> Everett, WA 98201 Bothell, WA 98012 <br /> Attn: Joseph Fordon Attn: Rick Gilmore <br /> Telephone: (425) 263-5348 Telephone: (425) 337-3647 <br /> Frontier Communications Puget Sound Energy (Gas) <br /> 1800 41st Street 1140 N 94th Street <br /> Everett, WA 98201 Seattle, WA 98103 <br /> Attn: Brian Smith Attn: Parker Indorf <br /> Telephone: (425) 263-4038 Telephone: (206) 517-3404 <br /> CenturyLink WSDOT Traffic/Signals <br /> 1208 NE 64th Street, Rm 401 15700 Dayton Avenue N. <br /> Seattle, WA 98115 Seattle, WA 98133 <br /> Attn: Tung Le Attn: Greg Wagner <br /> Telephone: (206) 641-6622 Telephone: (206) 440-4397 <br /> Zayo Group Snohomish County Traffic/Signals <br /> 22651 83`d Ave S 8915 Cathcart Way <br /> Kent, WA 98032 Snohomish, WA 98296 <br /> Attn: Joe Morton Attn. Robert Westlake, Supv. <br /> Telephone: (206) 832-4861 Telephone: (425) 388-7551 <br /> Level 3 <br /> 100 South Cincinnati Avenue <br /> Tulsa, OK 74103 <br /> Attn: Alan Smith <br /> Telephone: (918) 547-0050 <br /> If any damage is done to an existing utility, the Contractor shall notify an authority of the <br /> particular utility company involved, who will dispatch a crew to repair the damages at the <br /> Contractor's expense, or authorize the Contractor to repair the damage. <br /> Public and private utilities, or their Contractors, will furnish all work necessary to adjust, <br /> relocate, replace, or construct their facilities unless otherwise provided for in the Plans or these <br /> Special Provisions. Such adjustment, relocation, replacement, or construction will be done <br /> during the prosecution of the work for this project. It is anticipated that utility adjustment, <br /> relocation, replacement or construction within the project limits will be completed as follows: <br /> Swift Green Line—Corridor Stations Special Provisions SP45 <br /> May 2017 <br />