My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exceptions to this are noted in the Bid Documents or will be brought to the Contractor's <br /> attention by a duly issued Addendum. <br /> Whenever any of the work is accomplished on or through property other than public Right of <br /> Way, the Contractor shall meet and fulfill all covenants and stipulations of any easement <br /> agreement obtained by the Contracting Agency from the owner of the private property. <br /> Copies of the easement agreements may be included in the Contract Provisions or made <br /> available to the Contractor as soon as practical after they have been obtained by the <br /> Engineer. <br /> Easements or rights of entry have not been acquired prior to advertising for the following <br /> parcels: <br /> • North Creek Center(180th Southbound Station#3049) <br /> Parcels#2705180010-0100 and 2705180010-1600 <br /> • Best Medical Supplies Inc. (164th Southbound Station#3048) <br /> Parcel#0073110000-0500 <br /> It is anticipated that Community Transit will have property rights in-hand prior to Notice to <br /> Proceed. The Contractor shall not proceed with any portion of the work in areas where right <br /> of way, easements or rights of entry have not been acquired until the Engineer certifies to <br /> the Contractor that the right of way or easement is available or that the right of entry has <br /> been received. If the Contractor is delayed due to acts of omission on the part of the <br /> Contracting Agency in obtaining easements, rights of entry or right of way, the Contractor <br /> will be entitled to an extension of time. The Contractor agrees that such delay shall not be a <br /> breach of contract. <br /> The Contracting Agency has made commitments to property owners for work with <br /> Temporary Construction Easement and Easement areas, or that otherwise impact <br /> their property. A summary of these agreements is included in Appendix D. <br /> Each property owner shall be given 2 business days' notice prior to entry by the Contractor. <br /> This includes entry onto easements and private property where private improvements must <br /> be adjusted. <br /> The Contractor shall be responsible for providing, without expense or liability to the <br /> Contracting Agency, any additional land and access thereto that the Contractor may desire <br /> for temporary construction facilities, storage of materials, or other Contractor needs. <br /> However, before using any private property, whether adjoining the work or not, the <br /> Contractor shall file with the Engineer a written permission of the private property owner, <br /> and, upon vacating the premises, a written release from the property owner of each property <br /> disturbed or otherwise interfered with by reasons of construction pursued under this <br /> contract. The statement shall be signed by the private property owner, or proper authority <br /> acting for the owner of the private property affected, stating that permission has been <br /> granted to use the property and all necessary permits have been obtained or, in the case of <br /> a release, that the restoration of the property has been satisfactorily accomplished. The <br /> statement shall include the parcel number, address, and date of signature. Written releases <br /> must be filed with the Engineer before the Completion Date will be established. <br /> Swift Green Line—Corridor Stations Special Provisions SP54 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.