My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No other work shall be performed on the site until the Contracting Agency has accepted the <br /> installation of high visibility fencing, as described in the Contract. <br /> Section 1-08.4 is supplemented with the following: <br /> 1-08.4(1) Sequence of Construction <br /> The sequence and limitations of construction are dictated by the specific characteristics of <br /> the Work and the Site. The Contractor shall comply with and include in its Construction <br /> Schedule the limitations of Work specified in this Section. <br /> The Contractor must plan and sequence the work in a logical sequence. <br /> The contractor shall not leave any site open for more than three weeks without the approval <br /> of Community Transit unless this intent is clearly shown in the construction schedule and <br /> approved by Community Transit when the specific site construction is occurring. A site open <br /> is defined as a site being worked on by the contractor between initial clearing stage and <br /> placement of platform, driveway and sidewalk concrete. If the site platform has been placed, <br /> but the column footing access closure pours have not occurred, the site will not be <br /> considered open. It is not the intent of this construction to open a site, perform clearing and <br /> grading, and then let it sit open for an extended period of time before surfacing and paving is <br /> performed. <br /> Sequence of Work: <br /> 1. The Contractor shall commence work immediately upon Notice to Proceed (NTP) and <br /> pursue the Work in an orderly fashion such that the Physical Completion date is met. <br /> The Work requires careful sequencing to properly coordinate the Work with activities <br /> related to compliance with permits from local and state agencies, and proper sequencing <br /> of construction activities. <br /> 2. The contractor shall not leave any Station site open for more than four(4)weeks without <br /> the approval of Community Transit unless this intent is clearly shown in the construction <br /> schedule and approved by Community Transit. A site open is defined as a site being <br /> worked on by the contractor between initial clearing stage and placement of platform, <br /> driveway and sidewalk concrete. If the site platform has been placed, but the column <br /> footing access closure pours have not occurred, the site will not be considered open. It <br /> is not the intent of this construction to open a site, perform clearing and grading, and <br /> then let it sit open for an extended period of time before surfacing and paving is <br /> performed. <br /> 3. No work requiring lane closures shall occur on Northbound and Southbound Station <br /> pairs concurrently unless previously reviewed and approved by the Engineer and the <br /> applicable jurisdiction(s). <br /> 4. Canyon Park Park & Ride—Temporary closure of parking stalls along the southern row <br /> of the Park & Ride (adjacent to new sidewalk), and of the parallel stalls along the drive <br /> aisle shall be limited in duration to 60 calendar days in order to minimize temporary <br /> parking impacts. <br /> 5. Roadway Widening on SR 527 at 164th Street SE (Penny Creek Crossing area)— <br /> Construction of roadway widening in this area shall be scheduled for completion during <br /> May 1st through September 30th. <br /> Swift Green Line—Corridor Stations Special Provisions SP58 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.