6. SR 96 Cement Concrete Roadway at Stations along SR 96—Construction of cement <br /> concrete roadway at Stations along SR 96 shall be scheduled for completion in 2017 in <br /> order to precede WSDOT's planned overlay on SR 96. <br /> 7. Owner-furnished Station Shelter and Amenities Installation and Commissioning —See <br /> Special Provisions, Section 1-08.5 below for details. <br /> 1-08.5 Time for Completion <br /> (August 14, 2013 APWA GSP, Option A) <br /> Revise the third and fourth paragraphs to read: <br /> Contract time shall begin on the first working day following the Notice to Proceed Date. <br /> Each working day shall be charged to the contract as it occurs, until the contract work is <br /> physically complete. If substantial completion has been granted and all the authorized <br /> working days have been used, charging of working days will cease. Each week the <br /> Engineer will provide the Contractor a statement that shows the number of working days: (1) <br /> charged to the contract the week before; (2) specified for the physical completion of the <br /> contract; and (3) remaining for the physical completion of the contract. The statement will <br /> also show the nonworking days and any partial or whole day the Engineer declares as <br /> unworkable. Within 10 calendar days after the date of each statement, the Contractor shall <br /> file a written protest of any alleged discrepancies in it. To be considered by the Engineer, <br /> the protest shall be in sufficient detail to enable the Engineer to ascertain the basis and <br /> amount of time disputed. By not filing such detailed protest in that period, the Contractor <br /> shall be deemed as having accepted the statement as correct. If the Contractor is approved <br /> to work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week in <br /> which a 4-10 shift is worked would ordinarily be charged as a working day then the fifth day <br /> of that week will be charged as a working day whether or not the Contractor works on that <br /> day. <br /> Revise the sixth paragraph to read: <br /> The Engineer will give the Contractor written notice of the completion date of the contract <br /> after all the Contractor's obligations under the contract have been performed by the <br /> Contractor. The following events must occur before the Completion Date can be <br /> established: <br /> 1. The physical work on the project must be complete; and <br /> 2. The Contractor must furnish all documentation required by the contract and required by <br /> law, to allow the Contracting Agency to process final acceptance of the contract. The <br /> following documents must be received by the Project Engineer prior to establishing a <br /> completion date: <br /> a. Certified Payrolls (per Section 1-07.9(5)). <br /> b. Material Acceptance Certification Documents <br /> c. Quarterly Reports of Amounts Credited as DBE Participation, as required by the <br /> Contract Provisions. <br /> d. Final Contract Voucher Certification <br /> Swift Green Line—Corridor Stations Special Provisions SP59 <br /> May 2017 <br />