My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. SR 96 Cement Concrete Roadway at Stations along SR 96—Construction of cement <br /> concrete roadway at Stations along SR 96 shall be scheduled for completion in 2017 in <br /> order to precede WSDOT's planned overlay on SR 96. <br /> 7. Owner-furnished Station Shelter and Amenities Installation and Commissioning —See <br /> Special Provisions, Section 1-08.5 below for details. <br /> 1-08.5 Time for Completion <br /> (August 14, 2013 APWA GSP, Option A) <br /> Revise the third and fourth paragraphs to read: <br /> Contract time shall begin on the first working day following the Notice to Proceed Date. <br /> Each working day shall be charged to the contract as it occurs, until the contract work is <br /> physically complete. If substantial completion has been granted and all the authorized <br /> working days have been used, charging of working days will cease. Each week the <br /> Engineer will provide the Contractor a statement that shows the number of working days: (1) <br /> charged to the contract the week before; (2) specified for the physical completion of the <br /> contract; and (3) remaining for the physical completion of the contract. The statement will <br /> also show the nonworking days and any partial or whole day the Engineer declares as <br /> unworkable. Within 10 calendar days after the date of each statement, the Contractor shall <br /> file a written protest of any alleged discrepancies in it. To be considered by the Engineer, <br /> the protest shall be in sufficient detail to enable the Engineer to ascertain the basis and <br /> amount of time disputed. By not filing such detailed protest in that period, the Contractor <br /> shall be deemed as having accepted the statement as correct. If the Contractor is approved <br /> to work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week in <br /> which a 4-10 shift is worked would ordinarily be charged as a working day then the fifth day <br /> of that week will be charged as a working day whether or not the Contractor works on that <br /> day. <br /> Revise the sixth paragraph to read: <br /> The Engineer will give the Contractor written notice of the completion date of the contract <br /> after all the Contractor's obligations under the contract have been performed by the <br /> Contractor. The following events must occur before the Completion Date can be <br /> established: <br /> 1. The physical work on the project must be complete; and <br /> 2. The Contractor must furnish all documentation required by the contract and required by <br /> law, to allow the Contracting Agency to process final acceptance of the contract. The <br /> following documents must be received by the Project Engineer prior to establishing a <br /> completion date: <br /> a. Certified Payrolls (per Section 1-07.9(5)). <br /> b. Material Acceptance Certification Documents <br /> c. Quarterly Reports of Amounts Credited as DBE Participation, as required by the <br /> Contract Provisions. <br /> d. Final Contract Voucher Certification <br /> Swift Green Line—Corridor Stations Special Provisions SP59 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.