My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-09.9 Payments <br /> (March 13, 2012 APWA GSP) <br /> Delete the first four paragraphs and replace them with the following: <br /> The basis of payment will be the actual quantities of Work performed according to the <br /> Contract and as specified for payment. <br /> The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> performed on a monthly basis. A breakdown is not required for lump sum items that include <br /> a basis for incremental payments as part of the respective Specification. Absent a lump <br /> sum breakdown, the Project Engineer will make a determination based on information <br /> available. The Project Engineer's determination of the cost of work shall be final. <br /> Progress payments for completed work and material on hand will be based upon progress <br /> estimates prepared by the Engineer. A progress estimate cutoff date will be established at <br /> the preconstruction conference. <br /> The initial progress estimate will be made not later than 30 days after the Contractor <br /> commences the work, and successive progress estimates will be made every month <br /> thereafter until the Completion Date. Progress estimates made during progress of the work <br /> are tentative, and made only for the purpose of determining progress payments. The <br /> progress estimates are subject to change at any time prior to the calculation of the final <br /> payment. <br /> The value of the progress estimate will be the sum of the following: <br /> 1. Unit Price Items in the Bid Form—the approximate quantity of acceptable units of <br /> work completed multiplied by the unit price. <br /> 2. Lump Sum Items in the Bid Form—based on the approved Contractor's lump sum <br /> breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> determination. <br /> 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site or <br /> other storage area approved by the Engineer. <br /> 4. Change Orders—entitlement for approved extra cost or completed extra work as <br /> determined by the Engineer. <br /> Progress payments will be made in accordance with the progress estimate less: <br /> 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 2. The amount of progress payments previously made; and <br /> 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> Contract Documents. <br /> Progress payments for work performed shall not be evidence of acceptable performance or <br /> an admission by the Contracting Agency that any work has been satisfactorily completed. <br /> The determination of payments under the contract will be final in accordance with Section <br /> 1-05.1. <br /> Swift Green Line—Corridor Stations Special Provisions SP63 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.