Laserfiche WebLink
1-09.9 Payments <br /> (March 13, 2012 APWA GSP) <br /> Delete the first four paragraphs and replace them with the following: <br /> The basis of payment will be the actual quantities of Work performed according to the <br /> Contract and as specified for payment. <br /> The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> performed on a monthly basis. A breakdown is not required for lump sum items that include <br /> a basis for incremental payments as part of the respective Specification. Absent a lump <br /> sum breakdown, the Project Engineer will make a determination based on information <br /> available. The Project Engineer's determination of the cost of work shall be final. <br /> Progress payments for completed work and material on hand will be based upon progress <br /> estimates prepared by the Engineer. A progress estimate cutoff date will be established at <br /> the preconstruction conference. <br /> The initial progress estimate will be made not later than 30 days after the Contractor <br /> commences the work, and successive progress estimates will be made every month <br /> thereafter until the Completion Date. Progress estimates made during progress of the work <br /> are tentative, and made only for the purpose of determining progress payments. The <br /> progress estimates are subject to change at any time prior to the calculation of the final <br /> payment. <br /> The value of the progress estimate will be the sum of the following: <br /> 1. Unit Price Items in the Bid Form—the approximate quantity of acceptable units of <br /> work completed multiplied by the unit price. <br /> 2. Lump Sum Items in the Bid Form—based on the approved Contractor's lump sum <br /> breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> determination. <br /> 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site or <br /> other storage area approved by the Engineer. <br /> 4. Change Orders—entitlement for approved extra cost or completed extra work as <br /> determined by the Engineer. <br /> Progress payments will be made in accordance with the progress estimate less: <br /> 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 2. The amount of progress payments previously made; and <br /> 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> Contract Documents. <br /> Progress payments for work performed shall not be evidence of acceptable performance or <br /> an admission by the Contracting Agency that any work has been satisfactorily completed. <br /> The determination of payments under the contract will be final in accordance with Section <br /> 1-05.1. <br /> Swift Green Line—Corridor Stations Special Provisions SP63 <br /> May 2017 <br />