Laserfiche WebLink
DIVISION 5 <br /> SURFACE TREATMENTS AND PAVEMENTS <br /> 5-04 HOT MIX ASPHALT <br /> (M'arch 30, 2017 APWA GSP) <br /> Delete WSDOT Amended Section 5-04, Hot Mix Asphalt dated April 3, 2017 and replace it with <br /> Section 5-04, Hot Mix Asphalt as printed in the Standard Specifications for Road, Bridge and <br /> Municipal Construction, 2016 edition. <br /> 5-04.1 Description <br /> This Section is supplemented with the following: <br /> This work also includes providing and placing HMA for asphalt concrete parking areas and <br /> driveway aprons, and roadway repair where shown in the Plans. <br /> 5-04.3 Construction Requirements <br /> Section 5-04.3 is supplemented with the following: <br /> HMA for asphalt concrete parking areas and driveway aprons, and roadway repair shall be <br /> constructed per the details shown on the Plans. <br /> 5-04.3(1) Hot Mix Asphalt Mixing Plant <br /> (August 3, 2009 WSDOT GSP) <br /> Weather Limitations <br /> The first sentence of Section 5-04.3(1) is revised to read: <br /> HMA for wearing course shall not be placed on any travelled way from ***October 1st <br /> *** and through March 31st of the following year without written approval from the <br /> Engineer. <br /> 5-04.3(3) Hot Mix Asphalt Pavers <br /> 5-04.3(3)A Material Transfer Device/Vehicle <br /> (January 16, 2014 APWA GSP) <br /> The first paragraph of this section is revised to read: <br /> Additionally, a material transfer device or vehicle (MTD/V) is not required. <br /> 5-04.3(7)A2 Statistical or Nonstatistical Evaluation <br /> Delete this section and replace it with the following: <br /> 5-04.3(7)A2 Nonstatistical Evaluation <br /> (January 16, 2014 APWA GSP) <br /> Swift Green Line—Corridor Stations Special Provisions SP75 <br /> May 2017 <br />