Laserfiche WebLink
DIVISION 4 <br /> BASES <br /> 4-04 BALLAST AND CRUSHED SURFACING <br /> 4-04.4 Measurement <br /> Section 4-04.4 is supplemented with the following: <br /> "Crushed Surfacing Top Course"will be measured by the ton. <br /> "Crushed Surfacing Base Course"will be measured by the ton. <br /> "Crushed Surfacing Top Course for BRT"will be measured by the ton. <br /> 4-04.5 Payment <br /> Section 4-04.5 is supplemented with the following: <br /> "Crushed Surfacing Top Course", per ton <br /> "Crushed Surfacing Base Course", per ton <br /> "Crushed Surfacing Top Course for BRT", per ton. <br /> The unit contract prices for"Crushed Surfacing Top Course", "Crushed Surfacing Base Course", <br /> and "Crushed Surfacing Top Course for BRT" shall be full compensation for all costs incurred for <br /> excavation, loading, hauling, placing, and compacting the material. <br /> Crushed Surfacing Top Course for BRT denotes material placed under Station platform area and <br /> is designated as "for BRT"for FTA tracking purposes only. <br /> END DIVISION 4 <br /> Swift Green Line—Corridor Stations Special Provisions SP74 <br /> May 2017 <br />