My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5-Oi6 PERVIOUS CONCRETE PAVEMENT <br /> 5-06.1 Description <br /> This work shall consist of constructing a pervious cementitious pavement composed of portland <br /> cement concrete on a prepared subgrade or subbase in accordance with these Specifications <br /> and in conformity with the lines grades, thicknesses, and typical cross-sections shown in the <br /> Plans or established by the Engineer. <br /> 5-06.2 Materials <br /> Materials shall meet the requirements of the following sections: <br /> Portland Cement 9-01 <br /> Aggregates for Portland Cement Concrete 9-03.1 <br /> Premolded Joint Filler for Expansion Joints 9-04.1(2) <br /> Curing Materials and Admixtures 9-23 <br /> Water 9-25 <br /> Hydration stabilizing admixtures shall conform to the requirements of Section 9-23.6(3) or 9- <br /> 23.6(5). <br /> Synthetic Fibers for Concrete <br /> When specified synthetic fibers to be included in the mix for portland cement concrete shall <br /> conform to the requirements of ASTM D 7508/7508M. <br /> 5-06.3 Construction Requirements <br /> 5-06.3(1) Pervious Concrete Preconstruction Meeting <br /> Prior to the start of construction of the pervious concrete pavement section, including excavation <br /> of the pavement section, the Contractor shall coordinate, schedule and attend a preconstruction <br /> meeting for the pervious concrete pavement. The following are required to attend the meeting: <br /> 1. Contracting Agency representative. <br /> 2. General Contractor's representative(s). <br /> 3. Engineer of Record for the pervious concrete pavement. <br /> 4. Concrete placement lead person(s). <br /> 5. Associated Subcontractor's representative. <br /> 6. Pervious concrete Supplier's representative. <br /> 7. Material Testing Laboratory's representative. <br /> The meeting shall cover all aspects of the work including, but not limited to: <br /> 1. Submittals. <br /> 2. Short and long term schedule. <br /> 3. Inspection of the Work. <br /> 4. Protection of the Work. <br /> 5. Pervious concrete placement. <br /> 6. Curing. <br /> 7. Materials. <br /> 8. Specifications. <br /> 9. Testing. <br /> 10. Test panel and JMF. <br /> Swift Green Line—Corridor Stations Special Provisions SP79 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.